My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 3500 W LAKE CENTER DRIVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
12/16/2013
>
75A - PH 3500 W LAKE CENTER DRIVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2013 2:39:21 PM
Creation date
12/12/2013 2:14:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
12/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
77L <br />DILIFr (August 9, 1990) <br />3. Possible water erosion during construction shall be mitigated by the installation of <br />temporary erosion control devices by the project applicant, as required by the State <br />Regional Water Quality Control Board. <br />Timing of implementation/Verification: Ptlor to grading permit issuance and during <br />grading operation <br />Grading plan check and periodic field <br />inspections <br />Sr. Plan Check Engineer, Building Division <br />4. Utilization of desiltation devices such as sandbags in areas that may discharge into <br />city streets shall be implemented by the project applicant prior to the commencement <br />of grading activities. <br />Timing of Imp] ementationflVedfication: Prior to grading permit issuance <br />Methodof Verification: Grading plan check and field inspection <br />Recnonsible Pariv: Sr. Plan Check Engineer, Building Division <br />Verification (Name & Date): <br />S. The grading plan prepared by the applicant shall include a description of haul routes, <br />access points to the site, and a watering and sweeping program designed to minimize <br />impacts of haul operations. <br />Timing or Itpplemeni ation/VeriBeation: Prior to approval of any grading permits <br />and implementation during grading phase <br />Method of Verification: Grading plan check and periodic field <br />inspections <br />Res,nonsibie Party Sr. Plan Check Engineer, Building Division <br />Verirication name & -Vj*- <br />MIM- fP 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.