Laserfiche WebLink
776 <br />DRAFT (August 9, 1990) <br />TRAFFICICIRCULATION <br />1S. With the first building permit for the proposed project, the project applicant shall <br />construct a traffic signal at the intersection of Susan Strect/Sunflower Avenue in <br />accordance with standard traffic signal warrants. Under the terms of a pending <br />reimbursement agreement between the cities of Santa Ana and Costa Mesa, the <br />project applicant shall install, and provide initial costs for, this traffic signal but shall <br />eventually be reimbursed for all but the "fair share" of the signal costs associated with <br />the proposed Lake Center project. <br />Timing oP 1m 1 me ationNerjji ac tion; Concurrent with first building permit <br />construction <br />19. <br />20. <br />Method of Verification: Improvements plan check and field <br />inspection <br />Responsible Parties: Manager, Engineering Services <br />Verification (game " bate) <br />The project applicant shall install multiway (4 -way) "stop" signage at the intersection <br />of Lake Center and Susan Sireet. <br />Prior to first building permit issuance <br />Improvements plan check and field <br />inspection <br />Sr. Plan Check Engineer, Building Division <br />k. Manager, Engineer Services <br />The project applicant shall post a faithful performance bond for the future installation <br />of a traffic signal at Lake Center and MacArthur Boulevard. This intersection shall <br />be monitored as the project is constructed for satisfaction of signal warrant <br />requirements and the signal shall be installed as warranted. <br />F.mm-romarsom <br />k=ffg-m WWII <br />Prior to grading permit issuance <br />Written evidence provided by applicant <br />Sr.. Plan Check Engineer, Building Division <br />& Manager, Engineer Services <br />