Laserfiche WebLink
DRAFT (August 7t 1990) <br />21, The project applicant shall pay the City of Santa Ana transportation system <br />improvement fees which contribute funding towards needed areawide transportation <br />improvements. <br />Timing of ImpjementationNerification: Prior to grading permit issuance <br />Method of Verification: Written evidence provided by applicant& <br />City Manager's Office <br />Responsible Patties: Sr. Plan Check Engineer, BuDding Division <br />& Manager, Engineer Services <br />mamn. /► n �: <br />22. The project applicant shall provide plans for and install a bus stop shelter at the <br />existing bus stop location at Susan Street/Sunflower Avenue in accordance with Orange <br />County Transit District standards. Said plans shall be reviewed and approved by the <br />City of Santa Ana and OCTD prior to issuance of building permits. <br />Timm of 1mn1em4ntationLyerification: Prior to building permit issuance <br />Method of Verific to ion: Written evidence provided by applicant & <br />OCTD <br />R �nnnc'j�1e Panics: Sr. Plan Check Engineer, Building Division <br />& Manager, Engineering Services <br />kRIMIR-TUOTIN <br />23. The project applicant shall implement the proposed Transportation Demand <br />Management (TDM) Plan for the new development proposed within the Lake Center <br />specific development area. The TDM Plan shall be administered by an onsite <br />coordinator who shall be the responsibility of the property owner. <br />Timing of [mplementationNerffjcation: Ongoing during life of project <br />,M�nbod of Vedficalio, Written evidence provided by applicant on <br />an annual basis <br />Manager, Engineering Services& Manager, <br />Planning Department <br />G:885M3MP.BB <br />777 <br />