My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 3500 W LAKE CENTER DRIVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
12/16/2013
>
75A - PH 3500 W LAKE CENTER DRIVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2013 2:39:21 PM
Creation date
12/12/2013 2:14:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
12/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
779 <br />DRAFT (August 7, 1990) <br />27. To ensure smooth traMe operations for vehicles entering and exiting the site, a striped <br />median shall be provided by the project applicant on Susan Street. The City of Santa <br />Ana Public Works Department shall review and approve onsite roadway improvements <br />prior to issuance of building permits. <br />Timine pf ImplementaflonMrificatio n: Prior to building permit issuance <br />Method of Verification: improvements plan check and Geld <br />inspection <br />Responsible Parties; Manager, Engineering Services & Sr. Plan <br />Check Engineer, Building Division <br />r. I ;u •: <br />AIR QUALITY <br />28. The applicant shall implement fugitive dust suppression measures in accordance with <br />South Coast Air Quality Management D'istrict's Rule 403. Implementation of these <br />measures shall he monitored and reported to the City of Santa Ana. <br />n r a u. a •� •� <br />. •t 1 .0 ). <br />Prior to grading permit issuance <br />Grading plan check and field inspection <br />Sr. Plan Check Engineer, Building Division <br />29. Prior to the issuance of building permits for any new industrial uses, the applicant <br />shall provide evidence to the City of Santa Ana demonstrating compliance with all <br />SCAQMD Regulations, including Regulation XI11, New Source Review, as applicable. <br />Timing of,lmpIrra ntation/Verification: Prior to building permit issuance <br />Method o[ Verif cap tion: Written evidence provided by applicant <br />Res2msiblc; Sr. Plan Check Engineer, Building Division <br />Verification (Name & Date): <br />885MMP 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.