Laserfiche WebLink
•778 <br />DRAFT (August 7t 1990) <br />24. Lighting plans prepared by the project applicant shall be revised and approved by the <br />City of Santa Ana prior to building permit issuance to ensure that pedestrian acecss <br />routes to the bus stop at Sunflower and Susan are adequately illuminated. <br />Timing of Implementation/Verification: Prior to building permit issuance <br />Method of Verification: Plan check and field inspection <br />Ressponst eParties: Manager, Engineering Services & Sr. Plan <br />Check 'Engineer, Building Division <br />25. A stop sign shall be installed by the project applicant at all driveway locations to <br />control outbound traffic Cows. The City of Santa Ana Public Works Department <br />shall review and approve placement of stop signs prior to issuance of building permits. <br />Timin of ImplementationNerifcation: Prior to building permit issuance <br />Method of Verification: Improvements plan chuck and Geld <br />inspection <br />Resoonsble Parties: Manager, Engineering Services & Sr. Plan <br />Check Engineer, Building Division . <br />MMO . •t 4 n <br />26. Landscape plantings and signs shall be limited by the project applicant to 36 inches in <br />height within 25 feet of project driveways to ensure good visibility. The City of Santa <br />Ana Planning Department shall review and approve landscape plans prior to issuance <br />of grading permits. <br />ruing of Imnlcglen tat ionNerification: Prior to building permit issuance <br />Method of Verification: Landscape plans check and field inspection <br />Resnonsib le Parties: Manager, Engineering Services & Sr.Plan <br />Check Engineer, Building Division <br />•s n a. <br />GI�iTi�i7 <br />