Laserfiche WebLink
(r <br />I <br />I <br />ii <br />I� <br />DRAFT (August 7, 1990) <br />39. Prior to building permit issuance, the project applicant shall consult with Southern <br />California Edision (SCE) and Southern California Gas (SCG) representatives to ensure <br />the proposed project design is compatible with existing electrical and natural gas <br />services, respectively, and to reduce impacts of possible short -term outages to existing <br />customers during construction. <br />o-TS. ., <br />a .� •n - <br />Prior to building permit issuance <br />Improvements plan check and written <br />verification from Southern California <br />Edision and Southern California Gas <br />Sr. Plan Check Engineer, Building Division <br />40. Prior to issuance of building permits, the City of Santa Ana shall determine through <br />plan reviews that installation by the project applicant of needed onsite electrical and <br />natural gas systems to serve the project shall be coordinated with installation of other <br />utilities. <br />0301TOT41ne •� <br />L-09 - h 11 Fnf�`Pn <br />IreTtWOMMWINON <br />Prior to building permit issuance <br />Improvements plan check and Geld <br />inspection <br />Sr. Plan Cheek Engineer, Budding Division <br />& Manager, Engineer Services <br />41. Prior to issuance of building permits, the City of Santa Ana shall determine through <br />plan reviews that all buildings constructed by the project applicant within the project <br />site shall adhere to the State Title 24 energy standards, which set forth energy <br />conservation requirements. <br />Mining of imolemcntationNerification: Prior to building permit issuance <br />Method of Vcri(ication: Buildingand architectural plan checks and <br />field inspection <br />Responsjble Parties: Sr. Plan Check Engineer, Building Division <br />Verification (Zjame & Date) <br />M51M LI` <br />14 <br />