My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH 3500 W LAKE CENTER DRIVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2013
>
12/16/2013
>
75A - PH 3500 W LAKE CENTER DRIVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2013 2:39:21 PM
Creation date
12/12/2013 2:14:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
12/16/2013
Destruction Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., 784 <br />DRAFT (August 7, 1990) <br />41 Prior to issuance of building permits, the'City of Santa Ana shall determine through <br />plan reviews that all appliances to be installed by the project applicant within the <br />project site shall be energy efficient in accordance with the California Administrative <br />Code, Title 20, Chapter 2, Subchapter 4, Article 4. <br />Timing of lmplemenlal!Qn8��: Prior to building permit issuance <br />h4ethod of Verification: Building and architectural plan cheeks and <br />field inspection <br />Responnsjble Parties: Sr. Plan Check Engineer, Building Division <br />Verification (Name & Date) <br />43, The project applicant shall consult with SCE and SCG concerning energy conservation <br />Programs that could be incorporated into the project during construction. <br />Timing of erification: Prior to building permit issuance <br />Method of Veification: Written verification from Southern <br />California Edision & Southern California <br />Gas <br />Responsible Parties: Sr. Plan Check Engineer, Building Division <br />% dfication !came & Datel; <br />44. Prior to building permit issuance, plans for private onsite water supply facilities to <br />serve the project (fire hydrants and water lines) shall be reviewed and approved by the <br />City of Santa Ana Public Works Department, and shall be installed subsequently by <br />the project applicant. <br />liming of ImplementatignNerifica=: Prior to building permit issuance <br />_Method of Verification: Improvements plan check and field <br />inspection <br />Respgrisible Parties: Sr. Plan Check Engineer, Building Division <br />& Manager, Engineer Services <br />m <br />wwwaTIFt U. r, r. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.