Laserfiche WebLink
t.. ; p <br />DRAFT (August 7, 1990) 785 <br />45. Prior to building permit issuance, the City of Santa Ana Public Works Department <br />shall determine that water conservation measures are incorporated into the site design <br />in accordance with applicable state and city statutes and policies, including the use of <br />low -flush toilets, low -now faucets, self- closing valves on drinking fountains, water <br />pressure - reducing valves, low -water -using plants in landscaping, and efficient landscape <br />irrigation systems that minimize runoff and evaporation and maximize water reaching <br />1 plant roots. <br />i <br />i Timing of lImplementatdonNerification: Prior to building permit issuance <br />Method_Qf Verification: Landscape plan check and building <br />(plumbing) plan check and field inspection <br />Rbsponsihle Parties: Sr. Plan Check Engineer, Building Division <br />& Manager, Engineer Services <br />kmaRrorlwo n <br />46, Prior to building permit issuance, onsite wastewater collection facilities needed to serve <br />the project shall be reviewed and approved by the City of Santa Ana Public Works <br />Department and shall be installed by the project applicant. <br />Timing of lem ntationNerification: Prior to buuding permit issuance <br />Method of Verification: Improvements plan check and field <br />inspection <br />Responsiblg Parties: Sr. Plan Check Engineer, Building Division <br />& Manager, Engineer Services <br />i num"Two l <br />47- Prior to building permit issuance, site plans shall be reviewed by the City of Santa <br />Ana Public Works Department to verify that adequate space is provided onsite for <br />recycling receptacles. <br />Ti i of jrnplementation!Verification: Prior to building permit issuance <br />i <br />i <br />Mr,.thod of Verifjcgt o Building plans check and field inspection <br />Respgrii,81c Pan des: Sr. Plan Check Engineer, Building Division <br />& Manager, Engineer Services <br />Q0 5MI.— <br />16 <br />