My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - PARK LANDSCAPE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
01/21/2014
>
25C - AGMT - PARK LANDSCAPE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 4:45:47 PM
Creation date
1/16/2014 4:41:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
1/21/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.1.3 In addition, contractor shall instals 1/2" new Gall Materials "Pro -gold with Stabilizer" (brickdust) to <br />in -fields at all diamonds (minimum 26 tons per Girls Softball/Major Little League Field and <br />minimum 40 tons per Junior /Senior Little League Field). Also, the contractor shall install a <br />minimum of 1 ton of Turface calcite clay per Girls SoftbaWMajorLittle League Field and 2 tons of <br />Turfacc calcite clay to Junior /Senior Little League Fields Responsibility for and purchase of <br />necessary materials shall be at contractor's expense. <br />Note: The City has the right to move brickdust and Turface materials to other infields under this <br />agreement should they decide that an infield or infields do not require additional materials a <br />particular year. <br />11.0 Work To Be Completed "AS DIRECTED" <br />11.1 Replace Base ANUIORS as directed. <br />Note; City of Santa Ana use's the Roger's Breakaway base anchoring system. Contractor shall install base <br />anchors into the ground per manufacturer's standards. Top of stake shalt be approximately 2" below <br />the surface grade so that the base sits level and flush against the surface on all sides. <br />11.2 Replace Bases as directed. <br />Note; City of Santa Ana shall be responsible for supplying all necessary base anchors and /or bases to the <br />contractor as needed. <br />113 Replace or Remove/Level /Re- Install home plates as directed. <br />11.4 Replace or Remove/Level /Ro- Install pitching rubbers as directed. <br />Nnte: City of Santa Ana shall be responsible for supplying all necessary home plates and/or pitching rubbers <br />to the contractor as needed. <br />11.5 When given direction to complete "as directed" work, contractor shall complete the directed work on the <br />next working day. <br />12.0 Infield Turf Maintenance <br />12.1 Infield turf shall mean all sport turf in the infield, the foul territory of the infield and 36" beyond the infield <br />brickdust skin,line/arc. Infield turf shall be mowed two (2) times per week on Monday and Friday. <br />12.1,1 Contractor shall use a "greens" reel mower to provide "putting green" quality finish cut. <br />1112 Infield turf shall be cut between %" and 3 /d' per staffs direction. <br />12.1.3 All turf clippings shall be collected and disposed of. <br />12.2 Infield turf shall be irrigated to maximize healthy growth of the turf while conserving water. Over watering <br />will not be acceptable. <br />1221 Contractor shall check and program the automatic irrigation controller minimum one time per week. <br />12.2,2 Contractor shall provide any areas of the turf supplemental watering using a garden hose on an as <br />needed basis to assure a high quality turf infield. <br />25C -30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.