My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - PARK LANDSCAPE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
01/21/2014
>
25C - AGMT - PARK LANDSCAPE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2014 4:45:47 PM
Creation date
1/16/2014 4:41:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
1/21/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in -field boundaries with a string line or suitable method and re -sod up to the border to remedy the <br />situation at contractors expense. Preexisting conditions shall be corrected during contract start-up. <br />7.6pznal Watering. <br />7.6.1 This is the most time consumtne and a vezv i riporiaat element of the procedure. <br />7.6.2 The contractor shall final water the skinned brickdust to a depth of Y" minimum. <br />8.0 Rainy Weather /Wet Field Procedure <br />8.l On the next scheduled working day after a rainfall, the following procedure, in the order listed, shall be <br />adhered to: <br />8. 1.1 Remove all standing water from low spots either by slumming off excess water and spreading it out <br />to dry areas or using a pump /sopper system. <br />S. 1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gall Materials "Pro Gold with Stabilizer" Brickdust Materials from stock to all Wet <br />Areas and Rake Out, <br />9.0 Work to be Completed "131-1VIONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag built up amounts of <br />materials at high spots and cut and level drag the scarified material to low spots. The Contractor shall fill <br />any remaining low spots with new Gail M40f als "Pro Gold with Stabilizer" brickdust from stock and make <br />level. <br />Note: Staff shall identify areas to scarify /cut and level drag to the contractor at weekly meetings with <br />contractors appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to ti W' min, depth and allow settling in before play on field. <br />Note: Due to heavy watering and its need to settle before play, staff shall provide a schedule of bimonthly <br />scarify /cut and level drag dates to contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the City's Annual Sports <br />Turf Renovation Schedule. Fields renovated may change from year to year. <br />10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify drag built tip amounts of <br />materials at higb spots and curt and level drag the scarified material to low spots. The Coratraotor <br />shall fill any remaining low spots with new Gail Materials "Pro Gold with Stabilizer" bri ckdost <br />from stock and make level. <br />Note: Staff shall identify areas to scarify /out and level drag at the November meeting with <br />contractor's owner (as per section 6.3 of contract). <br />10.1.2 Contractor shall verify all base distances, pitehhrg rubber distances and pitching mound heights per <br />the Little League, Pony /Colt League specifications for each specific field. Contractor shall repair <br />any specifications not being met on any field. <br />25C -29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.