My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. <br />T. <br />PW <br />Mitigation Measures <br />1. To reduce the loss of property tax revenues, remaining portions of full- <br />take parcels will be evaluated for potential assemblage and <br />redevelopment or for sale to adjoining land owners. This will keep the <br />affected properties in private ownership and subject to assessment of <br />property taxes, based on current property values. <br />2. The City has adopted a redevelopment plan which encompasses the <br />Bristol Street corridor and surrounding areas, which will provide the <br />City Redevelopment Agency with tax increment financing abilities <br />which will be used to revitalize this general area, resulting in long -tern <br />economic benefits, including increasing property tax revenues from <br />property improvements. <br />-_ <br />EFFECT ON UTILITIES <br />e <br />� a <br />Consequences <br />The proposed project will not result in any impact to utilities other than <br />construction related impacts. These impacts are discussed in Section N.V. <br />It should be mentioned that an opportunity exists for the undergrounding of <br />NP <br />utilities during the right -of -way expansion. All undergrounding activities <br />should be coordinated with the appropriate utility purveyors. <br />Mitigation Measures <br />., <br />None are required. <br />CULTURAL RESOURCES <br />Paleontological Consequences <br />No significant impacts to paleontological resources are anticipated as a result <br />of the proposed street widening project. Based on the low paleontological <br />sensitivity of the rock units found in the Bristol Street area and the shallow <br />nature of the excavations associated with the proposed project, it is unlikely <br />that there will be any adverse impacts to paleontological resources in the APE. <br />-' <br />Therefore, no paleontological monitoring will be necessary during the <br />widening of Bristol Street. <br />Mitigation Measures <br />.� <br />None are required. <br />IV -58 <br />w <br />
The URL can be used to link to this page
Your browser does not support the video tag.