My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KA <br />Archaeological Consequences <br />No significant impacts to local archaeological resources are anticipated as a <br />result of the proposed project; however, it is possible that grading activities <br />could uncover such resources. <br />Mitigation Measures <br />1. If potential archaeological resources are encountered during grading, all <br />work will be halted in that particular location until a qualified archaeo- <br />logist can evaluate the significance of the recovered materials. <br />Historical Consequences <br />There are no historic structures located in the project area which are eligible <br />for National Register listing, according to a negative Historic Property Survey <br />Report (HPSR) and correspondence from the SHPO, as documented in <br />Section IX. <br />The widening of Bristol Street could potentially have an impact on subsurface <br />level artifacts deposited some time since the recordation of human events. <br />However, the probability of finding subsurface artifacts is considered to be low <br />due to the highly disturbed nature of the project area. <br />Mitigation Measures <br />The measures cited in the Historic Property Survey Report (HPSR) will be <br />observed. <br />IMPACTS TO TRANSPORTATION FACILITIES <br />The preferred alternative would not have any impacts on rail or airborne <br />traffic. No rail lines cross the project area and the project is not located in an <br />area constrained by airports or airborne traffic. <br />The proposed project, however, have a major effect on the local circulation <br />system. As is indicated in Section I. Need for Improvements, Bristol Street is <br />extremely congested during peak travel hours at present. Future projections <br />indicate that this condition will worsen as traffic is expected to increase. The <br />following analysis compares the preferred project alternative (Future With <br />Widening) to the No- Project condition (Future Without Widening). <br />Future traffic volumes, for the target year 2006, were developed using <br />historical and projected traffic, development and population data obtained <br />from the City of Santa Ana. Comparison of past and present traffic volumes <br />IV -59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.