My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
EXHIBIT 4-1_55A_BRISTOL WIDENING EIS-EIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2014 7:46:43 AM
Creation date
1/29/2014 3:20:49 PM
Metadata
Fields
Template:
City Clerk
Agency
Public Works
Item #
55A
Date
2/4/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
along Bristol Street revealed the growth in traffic to be approximately one <br />percent per year. In the Five -Year Transportation Study Update to 1990 <br />prepared by Basmaciyan- Darnell, Inc.; June 1985, the projected increase in <br />area -wide traffic volumes, south of the project area, was anticipated to be <br />greater than one percent per year. The volume of traffic on Bristol Street <br />north of Warner Avenue is however consistent with a one percent per year <br />growth rate. <br />It was assumed that in the year 2006, all roads would be built out to their <br />ultimate widths, as designated on the Orange County General Plan - Master <br />Plan of Arterial Highways ComComponent, County of Orange, Environmental <br />Management Agency, 1982. <br />Future Roadway Link Cap&QIty Without Widening <br />ow <br />Evaluation of the operating conditions Bristol Street would experience under +„ <br />future year 2006 traffic volumes was based upon the same methodology as was <br />described under Section I. Table 1 in Section I summarizes the project traffic <br />volumes on each link with their corresponding levels of service. <br />Under the "no- project" alternative, each link of Bristol Street from Memory <br />Lane to Warner Avenue would experience a Level of Service of "P. Traffic <br />on Bristol Street would be extremely congested and motorists would <br />experience a great deal of delay at all major intersections. <br />s. <br />Due to the limiting nature of a road system, there is an upper limit to the <br />volume of traffic which any roadway can carry. When traffic volume demand <br />exceeds these limits the remaining traffic will be forced onto adjoining roads in <br />the circulation system and affect their corresponding road capacities. The <br />traffic projections on Bristol Street north of McFadden Avenue are expected <br />to exceed the theoretical maximum roadway capacity for a four lane undivided M. <br />highway and the remaining traffic is expected to seek alternative routes. <br />However, because there are many variables that can affect the roadway <br />capacity, no attempt was made to quantify the theoretical maximum. The <br />traffic volumes projected for the future year 2006 may, therefore, be higher <br />than the roadway can actually accommodate. <br />Future Intersection Capacity Without Widening <br />ICU calculations were also performed at each signalized intersection for future ,. <br />traffic volumes under existing lane configurations. Table 4 in Section I <br />summarizes the anticipated V/C and intersection LOS values that are <br />anticipated under the no widening alternative. ... <br />IV -60 <br />PP <br />.w <br />
The URL can be used to link to this page
Your browser does not support the video tag.