My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (STREET MEDIANS) - 2013
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (STREET MEDIANS) - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 11:09:09 AM
Creation date
1/30/2014 10:23:05 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES, INC.
Contract #
A-2013-097
Agency
PUBLIC WORKS
Council Approval Date
6/17/2013
Expiration Date
6/17/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fBI <br />All work shall be performed in accordance with the HIGHEST INDUSTRY <br />STANDARDS, as stated in the enclosed maintenance specification <br />description. Standards and frequencies may be modified from time to <br />time as deemed necessary by the City for the proper maintenance of the <br />sites. <br />If, in the judgment of the City, the level of maintenance is less than that <br />specified herein, the City shall, at its option, in addition to or in lieu of <br />other remedies provided herein, withhold appropriate payment from the <br />Contractor until services are rendered in accordance with specifications <br />set forth within this document and providing no other arrangements have <br />been made between the contractor and the City. Failure to notify of a <br />change and /or failure to perform an item of work on a scheduled day may <br />result in deduction of payment for that date, week or month. Payment will <br />be retained for work not performed until such time as the work is <br />performed to City standards. <br />The Contractor is required to correct deficiencies within the time specified <br />by the City. If noted deficient work has not been completed, payment for <br />subject deficiency shall be withheld for current billing period and shall <br />continue to be withheld until deficiency is corrected, without right to <br />retroactive payments. <br />QUALITY OF WORK AND MATERIAL <br />All material and equipment furnished by the Contractor shall be new, high <br />grade, and free from defects and imperfections, unless otherwise <br />hereinafter specified. Workmanship shall be in accord with the best <br />standard practices. Both materials and workmanship shall be subject to <br />the approval of the Projects Manager or designee. All materials used <br />shall be approved in advance by the Projects Manager or designee. <br />The actual cost of all materials passed on to the City shall be wholesale <br />cost of the materials. <br />The wholesale cost shall be the actual cost paid by the Contractor <br />reflecting the best price, including discounts available. Receipts <br />shall be required for reimbursements. <br />• At no time shall the cost of materials exceed retail cost from the <br />current price list, minus the discount rates. <br />Typical costs of the irrigation parts, plant material, etc. to be <br />submitted to the City prior to approval. <br />The City reserves the right to purchase materials directly and make them <br />available to the Contractor. In the event the City exercises the option to <br />purchase the materials, the following conditions will apply: <br />Contractor shall conform to all City practices and procedures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.