My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (STREET MEDIANS) - 2013
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (STREET MEDIANS) - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 11:09:09 AM
Creation date
1/30/2014 10:23:05 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES, INC.
Contract #
A-2013-097
Agency
PUBLIC WORKS
Council Approval Date
6/17/2013
Expiration Date
6/17/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Persons employed by the Contractor who are found not to be satisfactory <br />by the City shall be discharged or reassigned by the Contractor on fifteen <br />(15) days' notice from the City. <br />G. PROVISIONS FOR EXTRAS <br />No new work of any kind shall be considered an extra unless a separate <br />estimate is given for said work and the estimate is approved by the City <br />before the work is commenced. The Contractor will be required to <br />provide before and after photographs of safety items or emergency <br />repairs which were made without prior City approval. Documentation of <br />contract compliance may be required on some occasions. <br />H. SAFETY REQUIREMENT <br />All work performed under this contract shall be performed in such a <br />manner as to provide maximum safety to the public and where applicable, <br />comply with all safety standards required by CAL -OSHA. The Projects <br />Manager or designee reserves the right to issue restraint or cease and <br />desist orders to the Contractor when unsafe or harmful acts are observed <br />or reported relative to the performance of the work under this contract. All <br />contractor vehicles shall have a "W.A.T.C.H." work area traffic control <br />manual at all times. <br />The Contractor shall maintain all work sites free of hazards to persons <br />and /or property resulting from his /her operations. Any hazardous <br />condition noted by the Contractor, which is not a result of his /her <br />operations, shall be immediately reported to the Projects Manager or <br />designee. <br />STREET CLOSURES, DETOURS, BARRICADES <br />Warning signs, lights, and devices shall be installed and displayed in <br />conformity with "The California Manual on Uniform Traffic Devices" for <br />use in performance of work upon highways issued by the State of <br />California, Department of Transportation and as directed by City staff. <br />If the Contractor fails to provide and install any of the signs or traffic <br />control devices required hereby or ordered by the City staff, staff may <br />cause such signs or traffic control devices to be placed by others, charge <br />the costs therefore against the Contractor, and deduct the same from the <br />next progress payment. <br />J. SCHEDULES <br />Annual Schedule <br />The Contractor shall provide an annual maintenance schedule <br />indicating the time frames when items of work shall be accomplished <br />per the performance requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.