Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB— Washington Avenue to 17`" Street <br />A Supplement to an EIR (or Supplemental EIR), which is narrower in scope than a Subsequent EIR, may <br />be prepared if any of the above criteria apply, but "[o]nly minor changes or additions would be necessary <br />to make the previous EIR adequately apply to the project in the changed situation" (CEQA Guidelines <br />Section 15163[a][2]). In the absence of the need to prepare either a Subsequent or Supplemental EIR, an <br />Addendum may be prepared. More specifically, CEQA Guidelines Section 15164 states: <br />(a) The lead agency or a responsible agency shall prepare an addendum to a previously <br />certified EIR if some changes or additions are necessary but none of the conditions <br />described in Section 15162 calling for preparation of a subsequent EIR have <br />occurred. <br />(b) An addendum to an adopted negative declaration may be prepared if only minor <br />technical changes or additions are necessary or none of the conditions described in <br />Section 15162 calling for the preparation of a subsequent EIR or negative declaration <br />have occurred. <br />(c) An addendum need not be circulated for public review but can be included in or <br />attached to the final EIR or adopted negative declaration. <br />(d) The decision making body shall consider the addendum with the final EIR or adopted <br />negative declaration prior to making a decision on the project. <br />(e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to <br />Section 15162 should be included in an addendum to an EIR, the lead agency's <br />findings on the project, or elsewhere in the record. The explanation must be <br />supported by substantial evidence. <br />This Addendum to the previously certified FEIS/EIR for the approved Project has been prepared because <br />the evaluation of the proposed modifications does not result in any of the circumstances requiring a <br />Subsequent or Supplemental EIS /EIR. Although the proposed modifications would result in development <br />that differs from that in the 1990 FEIS/EIR, those modifications do not trigger the need for preparation of <br />a Subsequent or Supplemental EIR under the criteria listed in CEQA Guidelines Sections 15162 and <br />15163, respectively. Sections 2.0 and 3.0 of this Addendum demonstrate that no substantial changes are <br />proposed in the approved Project or have occurred in the area of the Bristol Street Widening Phase IIIB <br />Project that will require major revisions to the previously certified 1990 FEIS /EIR due to the involvement <br />of new significant environmental effects or a substantial increase in the severity of previously identified <br />significant effects. Specifically, the proposed modifications, as compared to the 1990 FEIS /EIR, do not <br />result in new or substantially greater significant impacts because the scale and nature of the proposed <br />modifications are sufficiently similar to that analyzed in the 1990 FEIS/EIR such that the impacts of the <br />proposed modifications are within the levels and types of environmental impacts disclosed in the 1990 <br />FEIS /EIR. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (01/30/2014 REV3) 132597 CM PAGE 3 <br />55A -12 <br />