Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB— Washington Avenue to 17� Street <br />In addition, no substantial changes in circumstances under Section 15162(a)(2) have occurred since the <br />certification of the 1990 FEIS/EIR for the approved Project that would result in new significant impacts <br />or substantially increase the severity of significant impacts previously identified, since the background <br />environmental conditions have not significantly changed since that time. The City of Santa Ana has <br />received no information indicating there has been a substantial change in any circumstances that would <br />result in a new or substantially greater significant impact. <br />Furthermore, no new information, which was not known and could not have been known at the time of <br />the 1990 FEIS /EIR preparation, has been revealed that shows new or substantially greater significant <br />impacts would result (see CEQA Guidelines Section 15162(a)(3)). In addition, there are no new or <br />different mitigation measures or alternatives that would substantially reduce one or more significant <br />impacts of the approved Project but that are not adopted. The proposed modifications do not identify or <br />require adoption of any further mitigation measures or alternatives beyond those provided in the certified <br />1990 FEIS /EIR for the approved Project, since additional mitigation measures are either not necessary or <br />not feasible, and the alternatives analyzed in the 1990 FEIS /EIR represent a reasonable range as required <br />pursuant to CEQA (see CEQA Guidelines Section 15162(a)(3)). <br />This Addendum relies on the certified 1990 FEIS/EIR and the related administrative record, in addition to <br />the additional documentation included to support the Addendum, including the appendices. The <br />Addendum is to be included or attached to the 1990 FEIS /EIR and is not to be considered as an <br />independent or separate document. <br />As this Addendum does not identify new or substantially greater significant impacts, circulation for <br />public review and comment is not necessary pursuant to CEQA Guidelines Section 15164(c). However, <br />the City Council will consider and adopt or reject this Addendum at a public meeting (refer to CEQA <br />Guidelines Section 15164(d)). The findings of the City Council in its resolution of adoption of this <br />Addendum, if adopted, will reflect this Addendum which provides the basis and substantial evidence for <br />the decision not to prepare a Subsequent or Supplemental EIR (refer to CEQA Guidelines Section <br />15164(e)). <br />1.2 Project Location <br />The proposed Project includes a segment of Bristol Street between Washington Avenue and 17" Street in <br />the City of Santa Ana. The City of Santa Ana, located within the County of Orange, is surrounded by the <br />Cities of Tustin, Orange, Costa Mesa, Fountain Valley, and Garden Grove. The proposed Project site is <br />located approximately 1.5 miles north of the San Diego Freeway (I -405) and approximately three miles <br />south of State Route 22 (SR -22). Refer to Figures 1 and 2 for the regional map and Project location map <br />with proposed roadway alignment and widening. <br />1.2.1 Existing Land Uses <br />The Project area and surrounding vicinity is located within an urbanized area of the City of Santa Ana. <br />Existing land use along the Project corridor consists of commercial and institutional development, and <br />ANA 111 -334 (PER- 02 -0t) CITY OF SANTA ANA (01/30 /2014 REV3) 132897 CM PAGE 4 <br />55A -13 <br />