Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB— Washington Avenue to 17'" Street <br />1.4.3 Changes as Compared to the Approved Project <br />It should be noted that Project phasing has been revised from the original three phases identified in the <br />1990 FEIS /EIR. Construction phasing of the entire Project segment has been further subdivided as <br />follows: <br />• St. Andrew Place to McFadden Avenue (Constructed in 2002) <br />• Elm Street to Memory Lane (Constructed in 2003) <br />• Pine Street to 3d Street (Constructed in 2009) <br />• Phase I: McFadden Avenue to Pine Street (Constructed in 2011)1 <br />• Phase II: 3"' Street to Civic Center Drive (Under construction to be completed in 2014) <br />• Phase IIIA: Civic Center Drive to Washington Avenue <br />• Phase IIIB: Washington Avenue to 176' Street <br />• Phase IV: Warner Avenue to St. Andrew Place <br />• Phase V: 170' Street to Elm Street <br />The proposed street widening design configuration for the current Phase IIIB segment (proposed Project <br />addressed herein) differs from the original configuration of the 1990 FEIS/EIR, as follows: <br />• The proposed Project eliminates the dedicated eastbound right -turn lane and proposes a shared <br />right -turn lane in its place at the intersection of Bristol Street and 17"' Street. <br />• The 1990 FEIS /EIR, using decommissioned noise methodology, recommended noise barriers <br />(soundwalls) at all easterly parcel boundaries currently fronting the east side of Bristol Street <br />between Civic Center Drive and 17t0 Street. However, and using current noise modeling <br />methodology (URS Corporation, 2012c), noise abatement in the form of noise barriers is not <br />required for the proposed Project. <br />• For purposes of aesthetic treatment and enhancement, the proposed Project would install an <br />approximately 8 -foot high block wall at approximately the same location where the soundwall <br />was previously recommended (as addressed in the 1990 FEIS/EIR). <br />1 Phase numbers were assigned to the Bristol Street Widening Project subsequent to cancelation of the CenterLine Light Rail <br />Transit Project and associated reallocation of funding from that canceled project to the Bristol Street Widening Project. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (01/30/2014 REV3) 132897 CM PAGE 13 <br />55A -22 <br />