ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase IIIB— Washington Avenue to I7' Street <br />• The proposed Project increases the total right -of -way width from 120 feet to 128 feet. The <br />proposed Project right -of -way cross section would maintain a curb -to -curb width of 100 feet, <br />would accommodate a 7 -foot wide bike lane on each side of the roadway, and would not affect <br />the number or width of vehicular travel lanes as compared to the right -of -way cross section <br />addressed in the 1990 FEIS /EIR. However, the proposed Project right -of -way cross section, as <br />compared to the right -of -way cross section addressed in the 1990 FEIS /EIR, would reduce the <br />width of the sidewalks from 10 to 8 feet and also accommodate a 6 -foot wide parkway on each <br />side of Bristol Street to separate pedestrian and vehicular travel; a parkway was not included as <br />part of the roadway cross section addressed in the 1990 FEIS /EIR. Acquisition of property <br />resulting from the proposed Project right -of -way is accounted for in this analysis. <br />The proposed Project lane configuration is shown on Figure 5 (Proposed Project Lane Geometries), <br />whereas the lane configurations from the original approved 1990 FEIS /EIR are shown on Figures 6A and <br />6B (1990 FEIS /EIR Proposed Lane Geometries). The proposed block wall, as described above, is also <br />illustrated on Figure 5. <br />Since approval of the 1990 FEIS /EIR, the City of Santa Ana implemented several zone changes to Project <br />area parcels through approval of the Bristol Street Corridor Specific Plan. Also during this rime, Parcel <br />405- 252 -20 was identified as four commercial full takes; however, it is now identified as one commercial <br />full take. <br />An assessment of construction and Project related GHG emissions was also not addressed in the 1990 <br />FEIS/EIR, and as a result is addressed in this Addendum. <br />1.4.5 Construction Timeframe <br />Construction activities associated with the proposed Project would occur following acquisition of the <br />required parcels. Construction of the proposed Project is anticipated to begin in early 2015 and be <br />completed within approximately one year (early 2016). <br />1.5 Discretionary Actions <br />This Addendum must be adopted by the City of Santa Ana City Council as to its adequacy in complying <br />with the requirements of CEQA and the previously approved 1990 FEIS /EIR. The City Council will <br />consider the information contained in the Addendum and the 1990 FEIS/EIR in making a decision to <br />approve or deny the proposed Project. No discretionary actions with regards to the National <br />Environmental Policy Act (NEPA) or changes are proposed pursuant to NEPA. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (01/30/2014 REV3) 132897 CM PAGE 14 <br />55A -23 <br />