My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 5:07:10 PM
Creation date
1/30/2014 4:18:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17fb Street <br />variety of land uses such as commercial, office, residential and open space as provided in the approved <br />Specific Plan document. No agricultural uses exist on site or in the vicinity, and the Project would not <br />conflict with a Williamson Act contract as none exist in the Project area. The proposed Project would not <br />result in greater impacts than previously analyzed in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />d.) Result in the loss of forest land or conversion offorest land to non forest use? <br />The Project site is located within a highly urbanized area in the City of Santa Ana. No forest land is <br />located on site or in the vicinity. Implementation of the proposed Project would not result in greater <br />impacts than previously analyzed in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />e.) Involve other changes in the existing environment which, due to their location or nature, could <br />result in conversion of Farmland, to non - agricultural use or conversion of forest land to non - <br />forest use? <br />The Project site is located within a highly urbanized area in the City of Santa Ana. No forest land is <br />located on site or in the vicinity. Implementation of the proposed Project would not result in greater <br />impacts than previously analyzed, regarding farmland, in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />3.3 Air Quality <br />This section corresponds with Section IV - Environmental Consequences and Mitigation Measures, <br />Subsections H - Air Quality and V - Construction Impacts of the previously approved 1990 FEIS /EIR. <br />a.) Conflict with or obstruct implementation of the applicable air quality plan? <br />The Bristol Street Widening Project is fully funded and included in SCAG's 2012 Regional <br />Transportation Plan titled 2012 -2035 Regional Transportation Plan /Sustainable Communities Strategy <br />(RTP /SCS): Towards a Sustainable Future (2012 RTP) (RTP ID ORA125). The project is also currently <br />listed in SCAG's financially constrained 2013 Federal Transportation Improvement Program (2013 FTIP) <br />for fiscal year 2012/2013 — 2015/2016. The project entry in the 2013 FTIP identifies the following scope <br />of work: BRISTOL ST (WARNER TO MEMORY LANE) WIDEN FROM 4 TO 6 LANES (IMPV AT <br />ANA I I 1 -334 (PER- 02 -01) CITY OF SANTA ANA (01/30/2014 REV3) 132897 CM PAGE 22 <br />55A -31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.