My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 5:07:10 PM
Creation date
1/30/2014 4:18:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street Widening Phase IIIB— Washington Avenue to 17`" Street <br />BRISTOL/WARNER (ADD NB/EBISB THRU LNS; WB RT TRN LN) AND BRISTOLIFIRST (ADD NBISB THRU LNS; <br />SB LFT/RT /TRN LNS). <br />The Project's design concept and scope have not changed significantly from what was analyzed in the <br />RTIP and FTIP. This analysis found that the plan and, therefore the individual projects contained in the <br />plan, are conforming projects and would have air quality impacts consistent with those identified in the <br />SIPS for achieving the NAAQS. The FHWA determined the RTIP to conform to the SIP. <br />The proposed widening of Bristol Street, from Warner Avenue to Memory Lane has been included in the <br />FTIP since 1992. The FTIP gives priority to eligible Transportation Control Measures (TCMs) identified <br />in the SIP and provides sufficient funds to provide for their implementation. The FHWA determined the <br />FTIP to conform to the SIP on April 2, 2009. No significant impacts would occur. Implementation of the <br />proposed Project would not result in greater impacts than previously analyzed in the 1990 FEIS /EIR. <br />Furthermore, the South Coast Air Basin (SCAB) is designated by the state and US Environmental <br />Protection Agency (EPA) as nonattainment for ozone (03), and particulate matter (PM10 and PM2.5). <br />The South Coast Air Quality Management District (SCAQMD) developed regional emissions thresholds <br />to determine whether or not a project would contribute to air pollutant violations. If a project exceeds the <br />regional air pollutant thresholds, then the project would substantially contribute to air quality violations in <br />the SCAB. In addition, a project would also contribute to air pollutant violations if localized emissions <br />result in an exeeedance of the ambient air quality standards (AAQS). <br />Based on the Air Quality Assessment Report performed by URS Corporation (2013) for the Project, <br />short-term emissions generated during Project - related construction activities would not exceed the <br />SCAQMD regional emissions thresholds for any of the criteria pollutants and also would not substantially <br />elevate localized concentrations of these pollutants. Consequently, the Project would be consistent with <br />the Air Quality Management Plant (AQMP). Long -term emissions generated by the Project would not <br />exceed the SCAQMD thresholds for regional emissions and would therefore also not contribute to an <br />increase in frequency or severity of air quality violations. <br />The proposed Project would be consistent with the Major Arterial designation of the City of Santa Ana <br />General Plan Circulation Element and the County of Orange's Master Plan of Arterial Highways. <br />Additionally, the Project would improve traffic flow and result in a reduction in air pollutant emissions. <br />Mitigation Measures <br />No additional new mitigation measures are required. <br />b.) Violate any air quality standard or contribute substantially to an existing or projected air quality <br />violation? <br />Short -term emissions were modeled for the construction phase of the proposed Project. Construction <br />activities associated with the Project would include demolition of pavement and buildings, fine grading, <br />ANA 111 -334 (PER- 02 -01) CITY or SANTA ANA (01/30/2014 REV3) 132897 CM PAGE 23 <br />55A -32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.