My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 5:07:10 PM
Creation date
1/30/2014 4:18:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB— Washington Avenue to 17`" Street <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />e.) Create or contribute runoff water which would exceed the capacity of existing or planned storm <br />water drainage systems or provide substantial additional sources ofpolluted runoff? <br />Refer to response in 3.9 (c.), above. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />f.) Otherwise substantially degrade water quality? <br />Refer to response in 3.9 (c.), above. Impacts would be similar to those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />g.) Place housing within a 100 year flood hazard area as mapped on a federal Flood Hazard <br />Boundary or Flood Insurance Rate Map or other flood hazard delineation map? <br />The proposed widening would not place any housing within a 100 -year flooding zone as mapped by the <br />Federal Emergency Management Agency; therefore, no impact would result from the proposed Project in <br />that regard. Impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />h.) Place within a 100 year flood hazard area structures which would impede or redirect flood <br />flows? <br />Refer to response in 3.9 (g.), above. Impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />L) Expose people or structures to a significant risk of loss, injury or death involving flooding, <br />including flooding as a result of'the failure of a levee or dam? <br />ANA It t -334 (PER- 02 -01) CITY OF SANTA ANA (01/30/2014 REV3) 132897 CM PAGE 41 <br />55A -50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.