My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 5:07:10 PM
Creation date
1/30/2014 4:18:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB— Washington Avenue to 17" Street <br />proposed Project, occurring within an existing developed area, Project impacts are not considered <br />adverse. Therefore, impacts to water quality would be similar to those identified in the 1990 <br />FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />b.) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge <br />such that there would be a net deficit in aquifer volume or a lowering of the local groundwater <br />table level (e.g., the production rate of pre - existing nearby wells would drop to a level that would <br />not support existing land uses or planned uses for which permits have been granted)? <br />The proposed widening of Bristol Street, as addressed herein, would not result in increased water <br />consumption and would not deplete groundwater supplies. No impact to groundwater supplies would <br />result from the proposed Project. No mitigation measures are necessary. Impacts would be similar to <br />those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />c.) Substantially alter the existing drainage pattern of the site or area, including through the <br />alteration of the course of a stream or river, in a manner that would result in substantial erosion <br />or siltation on- or off-site? <br />The proposed Project would not alter the existing drainage pattern in the area. Storm drain improvements <br />would include the relocation and/or construction of catch basins and lateral drainage lines as necessary. <br />Therefore, implementation of the proposed Project would not result in a substantial erosion or siltation <br />on- or offsite due to drainage alteration. No mitigation measures are necessary. Impacts would be similar <br />to those identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />d.) Substantially alter the existing drainage pattern of the site or area, including through the <br />alteration of the course of a stream or river, or substantially increase the rate or amount of <br />surface runoff in a manner that would result in flooding on- or off -site? <br />Refer to response in 3.9 (c.), above. The proposed Project would not result in a substantial increase in <br />impervious ground surfaces, and therefore would not increase the rate or amount of surface runoff so as to <br />create on- or off -site flooding. Impacts would not be greater than previously analyzed in the 1990 <br />FEIS /EIR. <br />ANA 111 -334 (PER- 02 -01) CITY OF SANTA ANA (01/30/2014 REV3) 132897 CM PAGE 40 <br />55A -49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.