My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/04/2014
>
55A - RESO - ADDENDUM BRISTOL STREET WIDENING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2014 5:07:10 PM
Creation date
1/30/2014 4:18:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
2/4/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase II1B— Washington Avenue to 17`b Street <br />MODIFIED INITIAL STUDY CHECKLIST <br />ANA 11 1-334 (PER -02 -01) CITY OF SANTA ANA (11/25/2013 REV2) (32897 CM <br />55A -77 <br />New Impacts of Proposed <br />Previous FEIS /EIR <br />Project Changes <br />No <br />Less Than <br />Less Than <br />Potentially <br />Impacts <br />Subsequent or <br />Impact <br />Significant <br />Significant <br />Significant <br />Disclosed? <br />Supplemental EIR <br />Impact <br />After <br />Impact <br />Required? <br />- <br />Mitigation <br />b) Require or result in the construction of <br />X <br />YES <br />NO <br />new water or wastewater treatment <br />facilities or expansion of existing facilities, <br />the construction of which could cause <br />significant environmental effects? <br />.............................................................................................................................................................................. <br />X <br />YES <br />............................... <br />NO <br />c) Require or result in the construction of <br />new storm water drainage facilities or <br />expansion of existing facilities, the <br />construction of which could cause <br />significant environmental effects? <br />..............................................................................:.............................................................................................. <br />X <br />YES <br />............................... <br />NO <br />d) Have sufficient water supplies available <br />to serve the project from existing <br />entitlements and resources, or are new or <br />expanded entitlements needed? <br />.............................................................................................................................................................................. <br />X <br />YES <br />............................... <br />NO <br />e) Result in a determination by the <br />wastewater treatment provider which <br />serves or may serve the project that it has <br />adequate capacity to serve the project's <br />projected demand in addition to the <br />provider's existing commitments? <br />......................................................................................................................................................... <br />X <br />............................... <br />YES <br />NO <br />f) Be served by a landfill with sufficient <br />permitted capacity to accommodate the <br />project's solid waste disposal needs? <br />g) Comply with federal, state, and local <br />..........................................................................................................................................................:................... <br />X <br />YES <br />............................... <br />NO <br />statutes and regulations related to solid <br />waste? <br />18. MANDATORY FINDINGS OF <br />SIGNIFICANCE. Responses to the <br />following questions are discussed in <br />Chapter 3. <br />X <br />YES <br />NO <br />a) Does the project have the potential to <br />degrade the quality of the environment, <br />substantially reduce the habitat of a fish or <br />wildlife species, cause a fish or wildlife <br />population to drop below self- sustaining <br />levels, threaten to eliminate a plant or <br />animal community, reduce the number or <br />restrict the range of a rare or endangered <br />plant or animal or eliminate important <br />examples of the major periods of California <br />history or prehistory? <br />b) Does the project have impacts that are <br />............................................................................................................................................................................. <br />X <br />YES <br />............................... <br />NO <br />individually limited, but cumulatively <br />considerable? ( "Cumulatively <br />considerable' means that the incremental <br />effects of a project are considerable when <br />viewed in connection with the effects of <br />past projects, the effects of other current <br />ANA 11 1-334 (PER -02 -01) CITY OF SANTA ANA (11/25/2013 REV2) (32897 CM <br />55A -77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.