Laserfiche WebLink
3 1 P a g e <br />25A -10 <br />Guides /Player Handouts. <br />7. Provide up to 15 exercise control staff members for a 1 -day period. <br />The control staff can assist with exercise administration and control, <br />evaluation, and instruction. <br />8. Recruit up to 100 volunteers if required. <br />9. Provide controller /evaluator training describing the roles and <br />responsibilities of exercise controllers and evaluators. <br />10. Provide 10 vests to identify exercise controllers, 10 vests to identify <br />exercise evaluators, 10 vests to identify observers, 5 vests to identify <br />safety officers, and up to 150 badges to identify exercise participants, <br />evaluators, controllers, and observers. <br />11, Debrief and record notes from the exercise controllers and evaluators <br />prior to exercise completion. <br />12. Prepare and submit a draft AAR within 45 days of exercise <br />completion. Final AAR will be delivered no later than 60 days after <br />exercise completion. <br />13. Prepare 5 hard copies and 2 CD -ROM copies of the report. <br />14. Prepare all documents in accordance with HSEEP standards. <br />C) Cost <br />D) Maximum Number of Exercise <br />E) Duration of the Exercise <br />Participants for the Stated Cost <br />$65,000 <br />100 <br />8 hours <br />Active Shooter Drill <br />A) Type <br />B) Exercise Theme <br />Drill <br />Active Shooter Drill. This will evaluate the plans, policies, and procedures that <br />govern the response to an active shooter event. The drill will be conducted <br />over 8 hours on one day, and will include 175 participants from Orange <br />County Law Enforcement and Fire service agencies. This drill is not intended <br />to be a "design from scratch" effort. But rather the exercise design will <br />leverage and use the planning and materials developed for the Orange <br />County Operational Area Active Shooter exercise conducted at the former <br />Kaiser Permanente building in Anaheim in 2012. Willdan will facilitate the <br />design, delivery, and evaluation of the drill through completion of the <br />following items: <br />3 1 P a g e <br />25A -10 <br />