Laserfiche WebLink
TASK IV — FINAL PS &E ($46,695.00) <br />Upon approval of the Preliminary cad base layout the 65% PS &E preparation will begin. <br />1. Prepare Civil Design Plans (CW) <br />a. Site Erosion Control Plan. <br />b. Site Grading and On -Site Drainage Plan. <br />c. Site Utility Plan (Water and sewer for the restroom building). <br />d. Construction Details Plan. <br />e. Civil Specifications. <br />f. Civil Construction Cost Estimate. <br />2. Construction Staking Plan, Legend, Notes, Details, and Specifications (Tatsumi). <br />3. Construction Schedule of Materials (Tatsumi) <br />4. Site Element Details (Tatsumi) <br />5. Architectural Plans (DKY). <br />a. Site & Floor Plans <br />b. Reflected Ceiling Plan. <br />c. Roof Plan. <br />d. Interior Elevations. <br />e. Finish Schedule. <br />f. Door Schedule. <br />g. Interior & Exterior Details. <br />h. Foundation & Framing Plan, General Notes, Foundation and Framing Details. <br />i. Mechanical /Plumbing Plans, Mechanical HVAC Plan, Plumbing Plan, <br />Plumbing Fixture Schedule, Legends, Abbreviations, Mechanical & <br />Plumbing Details, Title -24. <br />j. Calculations. <br />k. Specifications. <br />I. Structural Engineering Calculations. <br />6. Electrical Plans (OMB) <br />a. Complete Pedestrian walkway, Park and Landscape Lighting Plans. <br />b. Power to Irrigation Controllers. <br />c. Amphitheatre Lighting. <br />d. Computerized Footcandle Calculations. <br />e. Specifications. <br />f. One Line Diagrams. <br />g. Electrical Load Calculations. <br />h. Panel Schedules, Details, Diagrams, Equipment Elevations and Legends. <br />i. Meetings. <br />25F -7 <br />