My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - LANDSCAPE CONSULTING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
02/18/2014
>
25F - AGMT - LANDSCAPE CONSULTING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2014 3:14:37 PM
Creation date
2/13/2014 1:54:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
2/18/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK IV — FINAL PS &E ($46,695.00) <br />Upon approval of the Preliminary cad base layout the 65% PS &E preparation will begin. <br />1. Prepare Civil Design Plans (CW) <br />a. Site Erosion Control Plan. <br />b. Site Grading and On -Site Drainage Plan. <br />c. Site Utility Plan (Water and sewer for the restroom building). <br />d. Construction Details Plan. <br />e. Civil Specifications. <br />f. Civil Construction Cost Estimate. <br />2. Construction Staking Plan, Legend, Notes, Details, and Specifications (Tatsumi). <br />3. Construction Schedule of Materials (Tatsumi) <br />4. Site Element Details (Tatsumi) <br />5. Architectural Plans (DKY). <br />a. Site & Floor Plans <br />b. Reflected Ceiling Plan. <br />c. Roof Plan. <br />d. Interior Elevations. <br />e. Finish Schedule. <br />f. Door Schedule. <br />g. Interior & Exterior Details. <br />h. Foundation & Framing Plan, General Notes, Foundation and Framing Details. <br />i. Mechanical /Plumbing Plans, Mechanical HVAC Plan, Plumbing Plan, <br />Plumbing Fixture Schedule, Legends, Abbreviations, Mechanical & <br />Plumbing Details, Title -24. <br />j. Calculations. <br />k. Specifications. <br />I. Structural Engineering Calculations. <br />6. Electrical Plans (OMB) <br />a. Complete Pedestrian walkway, Park and Landscape Lighting Plans. <br />b. Power to Irrigation Controllers. <br />c. Amphitheatre Lighting. <br />d. Computerized Footcandle Calculations. <br />e. Specifications. <br />f. One Line Diagrams. <br />g. Electrical Load Calculations. <br />h. Panel Schedules, Details, Diagrams, Equipment Elevations and Legends. <br />i. Meetings. <br />25F -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.