Laserfiche WebLink
APPENDIX A Proposal Response Form <br />(continued) <br />Sample Job #1: <br />Scope of Work: Provide and install (4) Category 5e cables, at 200 feet each, to the same <br />location in an air return ceiling area. Two cables will be terminated into a contractor - <br />provided 24 -port patch panel on one -side and 8P8C -type Category 5e modules on the <br />station side; the other two cables will be terminated into a contractor- provided 300FT 110 - <br />block assembly and again 8P8C -type Category 5e modules on the station side. Assume a <br />clear path in the ceiling to the patch panel and the station side, utilizing Erico J -hooks in <br />the ceiling for cable pathway support. On the station side, assume there is flex conduit <br />running from a single gang outlet box to the top of the wall, in a stub -out fashion. <br />1) Provide a breakdown of hours to be billed. <br />Place Cable including J -hook cable supports - 11.21 Hours <br />Terminate Work Station and IDF - 1.04 Hours <br />Install Panels Blocks Test and Label at IDF End 1.25 Hours <br />Total 13.5 Hours <br />2) Provide a breakdown of cost of materials. <br />2061 Plenum Cat 5e Cable: $244.36 <br />Cable supports including j -hooks & support rod $131.81 (based on 125 of cable sunuort <br />Termination and Labeling, Includes jacks, patch panel, 110 block & labels: $224.19 <br />Sales Tax: 1,18_03 <br />3) Provide details and amounts of any and all other charges that would be billed to the <br />City. <br />Total Labor and Material X1,319.51 <br />4) Provide approximation of elapsed time to complete work, beginning from authorization <br />to final acceptance. <br />5 business days <br />Page 7 of 9 <br />