Laserfiche WebLink
Exhibit C <br />• Drain lines to be snaked. <br />• New individual hot water heaters. <br />• Test all gas lines within each unit and repair /replace as necessary. <br />Drywall- New drywall installed will be installed as necessary. <br />Tub /Shower surrounds- Each tub /shower will receive a new tile tub surround with shower <br />enclosure. <br />o 10 total <br />Paint- each unit will be painted throughout. <br />Finish Hardware - <br />o New finish hardware will be installed throughout. <br />• New interior and front doors- 44 total <br />• Casing <br />• Base board <br />• Door hardware -44 total <br />• Stops -44 total <br />• Towel bars -10 total <br />Toilet paper holders -10 total <br />Vanity mirrors -10 total <br />Shelving <br />Cabinets- Each unit will receive new kitchen cabinets. <br />o 8 total -16 If uppers and lowers. <br />Appliances- <br />• Stoves- 8 total <br />• Refrigerators- 8 total <br />Countertops- New laminate countertops will be installed <br />o 8 total <br />Flooring- Vinyl, carpet, and carpet pad will be installed. <br />HVAC- New combination wall heater units to be installed. New bath and kitchen fans to be <br />installed which will be vented to the exterior to improve air quality. <br />• Wall units- 8 total <br />• Kitchen range hood- 8 total <br />• Bathroom fan- 10 total <br />251 -54 <br />