Laserfiche WebLink
Q: Where does the "street water" go? <br />A: We do not have the civil plans yet. <br />Q: Issues with street flooding when it rains. Water comes from Harbor down P to Newland. There is <br />only one catch basin in the area. There have been broken pipes in the area. <br />A: The project will contribute less water to th s issue because there will be less paved area. <br />Q: Will there be fire hydrants? <br />A: As required by the fire department. <br />Q: What is the zoning? <br />A: Currently agriculture. Proposal is to change to "Specific Development <br />Q: What is the minimum lot size? <br />A: The "Specific Development" designation does not have a minimum lot standard. The density is <br />designated by the General Plan (Medium Density). However, the lots will range from 3,500 to 4,000 <br />square feet. <br />Q: Will the homes be single family? <br />A: The homes are single family detached. However, the project is a 1 -lot subdivision with condo map. <br />This is a typical arrangement for infill projects in Orange County. <br />Q: Is there 5 feet of separate between buildings? <br />A: Yes. <br />Q: Will the materials to be used in the construction of the project be purchased from businesses in the <br />City of Santa Ana, <br />A: There is no requirement for that. Project will be bid out to multiple subs, <br />Q: Is Harbor to the east of the project? <br />A: Yes. <br />Q: Will there be a pool? <br />A: No. <br />.ft =f43 <br />