My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 STAR ELEVATOR SERVICE INC. -2013
Clerk
>
Contracts / Agreements
>
12345... NUMERICAL
>
5 STAR ELEVATOR SERVICE INC. -2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 1:27:25 PM
Creation date
4/9/2014 8:38:58 AM
Metadata
Fields
Template:
Contracts
Company Name
5 STAR ELEVATOR SERVICE INC.
Contract #
A-2013-166
Agency
PUBLIC WORKS
Council Approval Date
11/4/2013
Expiration Date
6/30/2014
Insurance Exp Date
2/25/2016
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Coordination with City personnel, including the Facilities Maintenance Superintendent. <br />• Coordinating all inspections required by the City as required by the permits. <br />• Job site safety for the Vendor /Contractor personnel as well as the general public using <br />the Library. <br />• Quality control and quallty assurance. <br />• Repair of all ancillary damage, such as patching and painting, caused by the <br />construction activities to the satisfaction of the City Project Manager. <br />• This RFP is based upon utilizing the existing conduit from the elevator machine room to <br />the elevator hoist way. If the existing conduit requires modification, replacement or Is <br />Inadequate for any reason, the modification cost shall be included in the proposal. <br />b. Permits: <br />Contractor shall apply for and obtain all necessary permits as required by the City and all <br />other regulatory agencies Including Federal, State, and County jurisdictions and.shall <br />include but is not limited to ASME A- 17.1 -2004. City permits will be "no fee" permits. All fees <br />required by other jurisdictions shall be the responsibility of the contractor. <br />Contractor shall ensure that the elevator meets all applicable codes and standards, <br />c. Installation: <br />Contractor shall provide all labor, material and incidentals for installation of all equipment as <br />outlined above. <br />Once elevator has been removed from service, the elevator shall not be operated or put <br />back into service for any reason until the State Inspector has completed a final inspection <br />and certified the elevator for public use, which shall be scheduled by the contractor. <br />Contractor shall install, set, evaluate, inspect and adjust as required the start, acceleration, <br />stop, door operation performance and closing force. Check all hall call and car call devices, <br />emergency devices, and Phase III] Fire Service. Perform load test as required. <br />Standard lead time on materials shall not exceed 12 weeks. <br />Estimated 'but of service" time will be 3 weeks per car subject to the State of California <br />Inspector timing and availability. This price shall include all labor, material, sales tax, <br />shipping and inspection fees and has been based upon performing all work during regular <br />working hours. <br />d. Inspections: <br />Contractor shall schedule the elevator inspection and obtain the approval of the Elevator, <br />Ride and Tramway Unit, State of California. <br />e. Guarantee: <br />Contractor shall provide a one -year guarantee on all work performed, <br />'p•"•�•m"�4Mk^�'+�EIEILM.�Ipltl EI�L� rwl.,�.w eyl�, <br />City of Santa Ana RFP 13 -038 <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.