| d) Inspection and R_ p._„nortinp: 
<br />(1' ) The Contractor shall physically inspect the operation of all irrigation systems once a month and prepare a 
<br />written report specifying park name, controller location/name, start times, run times, program name, station 
<br />number, and repairs needed. The Contractor shall maintain all sprinkler systems using City standard 
<br />irrigation products and details. All repairs shall be to City specifications and details. Repairs to irrigation 
<br />heads shall be with matching precipitation nozzles. Contractor shall ensure that excessive over spray/runoff 
<br />into street right -of -ways or other arras not intended to receive irrigation is controlled. The Contractor shall 
<br />repair at his own expense any irrigation head and lateral line rendered inoperable or malfunctioning due to 
<br />attrition, vandalism, etc. 
<br />(2) Contractor shall perform a visual inspection of all irrigated areas once per week. All areas receiving marginal 
<br />coverage shall receive supplemental irrigation by being irrigated by a portable irrigation method. The 
<br />contractor shall furnish all portable hoses, nozzles, sprinklers, etc., necessary to accomplish this additional 
<br />irrigation, Care shall be exercised to prevent a waste of water, erosion, and/or detrimental seepage into 
<br />existing underground improvements or structures, 
<br />e) Repairs 
<br />The Contractor shall be responsible for repairs to all irrigation heads, swing joints and lateral lines as a part of 
<br />this agreement. The Director will be responsible for repairs to the irrigation system from die valve to the water 
<br />meter. 
<br />8, l3ardsrape Maintenance 
<br />a) All paved areas, including but not limited to paved parking lots, curb gutters, pool decks, stamped. or other 
<br />enriched hard surface areas, shall be thoroughly cleaned once every other week between Monday and Friday. 
<br />Vacuums, blowers, sweepers or other approved equipment may be used to clean hardscape areas. Debris shall 
<br />not be. blown or swept onto adjacent planters, streets or property, All debris must be picked up by the Contractor 
<br />and removed from the site, Debris and litter that shall be cleaned includes, but is not Iimited to, leaves, twigs, 
<br />branches, trash, sand gravel, and worn asphalt. The City shall approve any equipment that is to be used for 
<br />cleaning hardscape. 
<br />b) Picnic facilities and park benches, including but not limited to picnic tables, barbecues, benches, concrete pads 
<br />and shelters shall be continuously maintained in a safe and clean condition. 
<br />C) Pavement cleaning — Contractor shall perform pressure washing quarterly (second week of January, April, July 
<br />and October) to remove dirt, stains, gum, tar, etc. from all paved pedestrian surfaces including sport courts, 
<br />sidewalks, picnic pads, paved areas around buildings, pedestrian crosswalks in streets that are concrete or 
<br />pavers, etc, 
<br />d) Site amenity cleaning — Contractor shall perform pressure washing of site amenities, such as but not limited to, 
<br />picnic tables, park. benches, skate park, walls, planters, raised curbing, railing, exterior of buildings, Overhead 
<br />shelters, etc. 
<br />(1) All picnic amenities (picnic tables, b,b.q.s, picnic shelters, concrete picnic pads, etc.) and park benches shall 
<br />be wiped cleat/ every day Monday through Sunday to assure that all trash, stains, spills, debris, glass, 
<br />staples, nails, tape, wire, etc, is removed. 
<br />(2) All picnic concrete paved areas and b,b,q.'s, park bench areas, patio areas, and areas adjacent building 
<br />entrances shall be cleaned once a month using /high pressure cleanine equiprent. 
<br />(3) All barbecues shall have ashes, charcoal or any other materials removed once a week. Contractor shall paint 
<br />the exterior of the b.b.q.'s and the post with heat and rust resistant flat black paint whenever rust appears. 
<br /> |