My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (PARK MAINT.) - 2014
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (PARK MAINT.) - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 10:02:40 AM
Creation date
4/29/2014 9:35:43 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES, INC.
Contract #
A-2014-015
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
1/7/2014
Expiration Date
1/31/2015
Insurance Exp Date
4/1/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Level fence line areas using a rock or leveling rake. <br />c) Weekly Maintenance <br />(1) Contractor will then edge the fence lines and warning track to achieve crisp <br />straight lines and a smooth crisp arc where the brickdust warning track meets the <br />sport turf. <br />d) Annual Sport /Priority Turf <br />e) Annually, the Contractor shall top dress turf using USGA mix at ' / ". Apply with <br />Dakota Turf Tender or an approved top dressing machine that will achieve a level <br />playing surface. <br />f) Non - recurring maintenance: <br />(1) During inclement weather the Contractor shall work to reopen baseball fields <br />as soon as possible. The Contractor shall use Diamond Dry or an approved <br />equal to warning tracts and fence lines. In addition, the Contractor shall use <br />hand pumps or any other reasonable method necessary to drain water off the <br />field. <br />11. Soccer /Football Field Maintenance <br />a) All soccer /football fields shall be inspected every day, Monday through Friday. <br />Contractor shall look for divots, depressions, debris, and other turf marring conditions. If <br />discovered, the Contractor shall fill in divots and depressions with approved USGA mix <br />mixed with Stovers Bermuda Dunes grass seed during the spring /summer and Stovers <br />Grand Slam perennial rye grass seed during the fall winter to re- establish the areas. <br />b) Areas of the field where turf has been worn away due to play shall be raked, dragged <br />and leveled each day to provide a level- playing surface free of divots, depressions and <br />uneven surfaces. The Contractor shall add approved topsoil to these areas as <br />necessary to keep the areas level and safe. <br />c) Annually, the Contractor shall top dress turf using USGA mix at ' / ". Apply with <br />Dakota Turf Tender or an approved top dressing machine that will achieve a level <br />playing surface. <br />12. Sport Court Maintenance <br />a) All sport courts shall be blown off weekly. Courts and fence lines shall be completely <br />free of dirt, debris, etc. <br />b) All tennis courts shall be pressure washed down every other week to remove dust, <br />gum and stains. The courts shall have water removed immediately following the <br />washing down. <br />c) All basketball and volleyball courts shall be pressure washed down monthly to <br />remove dust, gum and stains. The courts shall have water removed immediately <br />following the washing down. <br />d) Contractor shall continuously replace tennis and basketball nets when they become <br />worn or vandalized. The City shall furnish nets. <br />13. General Maintenance and Clean -Up For All Parks and Contracted Sites <br />Districts 1 and 3 Park Landscape RFP <br />Page 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.