My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPES, INC. (PARK MAINT.) - 2014
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPES, INC. (PARK MAINT.) - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 10:02:40 AM
Creation date
4/29/2014 9:35:43 AM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPES, INC.
Contract #
A-2014-015
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
1/7/2014
Expiration Date
1/31/2015
Insurance Exp Date
4/1/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) All trash and debris on the ground or in trash receptacles shall be removed from all <br />worksites each day Monday through Sunday before 12:00 p.m. This includes all parking <br />lots, landscape areas, paved areas, street curb gutters, flood control channels, etc. <br />Trash shall consist of all items 80 lbs. or less. All trash receptacles and lids shall be <br />wiped clean continuously as stains appear. <br />b) The contractor shall rake, hand remove, or vacuum leaves that are not absorbed by <br />planting. This shall be done as often as required to maintain a neat appearance. <br />c) After heavy windstorms or other inclement weather that impacts sites under this <br />agreement, the Contractor shall bring in extra staff to clean all parks areas within two (2) <br />days at no cost to the City. Debris (80 lbs. or less), such as but not limited to, litter, <br />fallen branches, trash, limbs, branches, soil erosion, etc., shall be removed from the <br />worksites. <br />d) The Contractor shall keep sidewalks and all other paved areas clean and free of any <br />debris, dirt, glass, weeds, leaves, etc. at all times. <br />e) Drain inlets shall be checked and if necessary cleaned once per day to avoid <br />flooding of areas during inclement weather. <br />14. Other Requirements <br />a) Work Not Scheduled <br />The Director may delete a portion of or the entire work site from contractual maintenance <br />during a construction period or any period where the Director determines that work <br />cannot be scheduled. The deletion of this portion of work will be reflected as a reduction <br />in the monthly payment to the Contractor. The amount of reduction will be based on the <br />percentage of area involved and will be determined by the City. <br />15. City Inspection <br />The Director or his designated representative shall regularly inspect the parks, playgrounds, <br />fields and all other City property subject to this Agreement. If said inspection results in <br />discovery of work that is not performed in the manner, and to the professional degree set forth <br />in the Specifications, Contractor agrees that the City shall deduct from Contractor's next <br />monthly payment, the City's actual or estimated cost of performing the work to bring the <br />property into conformance with the specifications. Additionally, City shall impose liquidated <br />damages of up to $300.00 per inspection, per park, per day not meeting the specifications <br />during any such inspection. <br />Districts 1 and 3 Park Landscape RFP <br />Page 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.