My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (10) - 2014
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (10) - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 10:39:25 AM
Creation date
4/30/2014 1:50:54 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2014-033
Agency
PUBLIC WORKS
Council Approval Date
2/4/2014
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />COOPERATIVE AGREEMENT NO. C -3 -2084 <br />KRAEMER BOULEVARD /GLASSELL STREET/ GRAND AVENUE RTSSP <br />F. To prepare a "Before and After Study" for the PROJECT as described in the Measure M2 <br />Eligibility Guidelines adopted by the AUTHORITY. The "Before and After Study" for the project is <br />considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />B.111.9) for the PROJECT. The AUTHORITY shall provide the "Before and After Study" to the <br />PARTICIPATING AGENCIES in draft and final formats for review and comment. AGENCY comments <br />shall be noted in the final study. If specified in original PROJECT APPLICATION, the AUTHORITY shall <br />provide a "Before and After Study" video of a representative portion of PROJECT. <br />G. To provide Ongoing Monitoring and Maintenance of optimized signal timing after Primary <br />Implementation of the PROJECT is completed and continue until the end of the three year grant period. <br />ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br />The PARTICIPATING AGENCIES agree to the following responsibilities for implementation and <br />funding of the PROJECT: <br />A. Provide a technical representative to meet and participate as a member of the <br />PROJECT's Traffic Forum. <br />B. To authorize the AUTHORITY to manage, procure, and implement all aspects of the <br />PROJECT. <br />C. To participate and support the PROJECT implementation within the timeframe outlined <br />in the APPLICATION and consistent with the CTFP Guidelines adopted by the AUTHORITY. <br />D. To provide the AUTHORITY all current intersection, local field master, and or central <br />control system timing plans and related data upon request. <br />E. To provide the local cash match and or documentation for the in -kind services match for <br />the PROJECT in accordance with Attachment B. Failure to provide included local cash match and or <br />evidence of in -kind services match may result in the loss of future participation for competitive funding <br />opportunities <br />F. PARTICIPATING AGENCIES that have included a dollar match as identified in <br />Attachment B shall provide payment for the dollar match to the AUTHORITY within 30 calendar days of <br />Page 6 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.