My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO - BRISTOL ST IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
05/06/2014
>
55C - RESO - BRISTOL ST IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2014 4:26:19 PM
Creation date
5/1/2014 4:23:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
5/6/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORTADDENDUM <br />Bristol Street Widening Phase IIIB — Washington Avenue to 17" Street <br />c.) Require or result in the construction of new storm water drainage facilities or expansion of <br />existing facilities, the construction of which could cause significant environmental effects? <br />The proposed Project would not substantively affect runoff volumes in the area. Rather, the Project would <br />improve existing drainage flow by constructing properly designed curb and gutter along the edges of <br />Bristol Street. No new significant impact is anticipated. Impacts would be similar to those identified in <br />the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />d.) Have sufficient water supplies available to serve the project from existing entitlements and <br />resources, or are new or expanded entitlements needed? <br />The proposed Project entails the widening of Bristol Street between Washington Avenue and 17a' Street; <br />such improvements would not result in any increase in water demand/consumption. Landscape <br />improvements, if applicable, would not require any new or expanded water entitlements. The proposed <br />Project would not create any new significant environmental impact. Impacts would be similar to those <br />identified in the 1990 FEIS/EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />e.) Result in a determination by the wastewater treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the project's projected demand in addition to the <br />provider's existing commitments? <br />Refer to response 3.17 (a.) and (b.), above. The proposed roadway widening Project would not result in an <br />increase in wastewater production. No new significant impact is anticipated. Impacts would be similar to <br />those identified in the 1990 FEIS /EIR. <br />Mitigation Measures <br />No new additional mitigation measures are required. <br />f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid <br />waste disposal needs? <br />The proposed Project would generate construction waste on a short -tern basis. Construction waste that <br />cannot be recycled would be taken to available landfills. The predominant receiving landfill for the City is <br />the Frank R. Bowerman Sanitary Landfill at 11002 Bee Canyon Access Road in Irvine. The landfill, <br />which is owned and operated by the Orange County Integrated Waste Management Department, opened <br />ANA 111 -334 (PER -02 -01) CITY OF SANTA ANA (11/25/2013 REV2) 132897 CM PAGE, 51 <br />55C -66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.