My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION 7
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
URS CORPORATION 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:51:45 PM
Creation date
5/14/2014 11:45:48 AM
Metadata
Fields
Template:
Contracts
Company Name
URS CORPORATION
Contract #
A-2007-169
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
5/1/2009
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bill Apple, Associate Planner <br />City of Santa Ana, Planning Division <br />March 11, 2008 <br />Page 11 <br />General Capacity Calculations and Level of Service (LOS) Standards <br />Traffic Impact Analyses include the calculation of LOS for each of the study roadway <br />segments, freeway ramp and intersections. The roadway segments LOS will be determined <br />using the methodology presented in the County MPAH. The LOS for signalized intersections <br />at Caltrans ramps will be based on the Highway Capacity Manual (HCM) methodology. The <br />LOS for unsignalized intersections will be based on the HCM methodology. At least, the <br />following analysis scenarios shall be considered. CMP intersections must be analyzed using <br />the specific CMP methodology presented in OCTA CMP <br />Based upon the Circulation and Land use Elements of the City of Santa Ana, the City <br />intersections located outside of Major Development Areas (MDA), considers LOS D as the <br />threshold for an acceptable service level for MDA. Furthermore, the City of Santa Ana <br />considers LOS E as the maximum threshold for acceptable service levels for intersections <br />located within MDA. <br />For locations outside of MDA, if the intersection is expected to operate at an unacceptable <br />level of service (LOS E or F) under base conditions (conditions without the project), <br />improvement and recommendations are requested to achieve acceptable levels of service at <br />the intersections. <br />For locations within MDA, if the intersection is expected to operate at unacceptable/poor <br />levels of service intersections (LOS F) at Santa Ana intersections within MDA) under base <br />conditions (conditions without the project), improvement and recommendations are requested <br />to achieve acceptable levels of service at the intersections. <br />A project is considered to have a significant traffic impact at an intersection if traffic LOS <br />deteriorates to an unacceptable level of service (i.e., LOS E or F at intersections outside of <br />MDA, LOS F within MDA with the addition of projected traffic. <br />Improvements are required for locations that operate at acceptable LOS without the project, <br />but which operate at an unacceptable LOS with the project. For locations that are forecasted <br />to operate worse than the acceptable even without the project, the traffic assessment must <br />include improvements to achieve acceptable LOS per the City of Santa Ana's standards. <br />General capacity nalysis guidelines are: <br />• The City of Santa Ana utilizes the following values in calculating Intersection <br />Capacity Utilizations (ICU's): through lane capacity — 1700 VPHPL; turn lane <br />capacity — 1600 VPHPL; clearance intervals 5%; no defacto for shared lanes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.