Laserfiche WebLink
CITY OF SANTA ANA <br />Project No. 14 -6798: 2013 -20121 Omnibus Concrete Replacement Contract <br />PROPOSAL, & CONTRACT AGRFFNIFNT <br />BID PROPOSAL, continued <br />Item Bid Item <br />Unit Quantity <br />UnitPrice <br />Amount <br />11, Remove and Construct 8" PCC <br />SP 800 <br />Pavement <br />12. Remove and Construct 12" PCC BUS <br />SF 900 <br />S, -11 <br />$ � <br />Pad <br />13. PCC Grinding <br />I.,f' 25 <br />$ 1_0 <br />$ ®� <br />14. Root Shave <br />15. Paint Red Curb <br />16. Remove and Construct Stamped <br />Concrete <br />17. Remove and Construct Brick <br />Pavement <br />18. FUrniSh and Install Water Valve Box <br />Frame and Cover to Grade <br />19, Adjust Manhole Frame and Cover to <br />Grade <br />20. Adjust Pull Box to Grade <br />21. furnish and Install No. 6 Pull Box <br />22, Concrete Steel Filled Bollard (include2 <br />coat orpaint) <br />TRAFFIC <br />23. Construct Speed Bump <br />24. Construct Raised Crosswalk <br />25, Repair Traffic Divertar (per Appendix D) <br />FA 60 $- --o-C70. <br />LP 25 <br />SP 50 $_.— _ $_.__..� _.a -o a <br />i <br />SP 50 $__G _ $6d CJ <br />FA 5 $ 00 $ , 410G p <br />FA 00`� <br />GSA 10_._ <br />FA 10 s oG $ a q cl <br />gg l <br />FA I $Q�. $ �/ ....C__GJ -GI <br />FA I <br />BP2of16 <br />