My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ON-CALL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
06/03/2014
>
25C - AGMT - ON-CALL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 5:30:08 PM
Creation date
5/29/2014 5:25:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/3/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement Exhibi t A <br />City of Santa Ana, PWA <br />RFP —ON -CALL ENGINEERING DESIGN SERVICES FOR WATER AND SEWER MAIN <br />IMPROVEMENTS <br />Firm experience — Experience of the firm in similar work and record of successful results <br />of that work. Also considered will be the firm's ability to take on additional work, <br />demonstrated understanding of the City's goals and purpose for this project, specific <br />management approach and how the firm proposes to achieve the project's time goals, <br />how well the firm's organizational structure shows sufficient depth for its present <br />workload, and the firm's ability to offer the breadth and quality of services required for <br />the project. (15%) <br />2. Experience of the personnel assigned to the project team — The City of Santa Ana will <br />give substantial consideration to the individual qualifications of the project team <br />members who will actually do most of the work on the proposed projects. <br />Considerations will include qualifications of key personnel, project team member's <br />individual experience and qualifications, project manager's experience, sub - consultant's <br />individual experience and other qualifications. (20 %) <br />3. Project Approach — Response to the project objectives outlined in the RFP, including <br />demonstrated understanding of the scope of the sample project, and demonstrated <br />ability to present technical data in a user - friendly format with appropriate use of graphics <br />as necessary. (25 %) <br />4. Project Management — A firm's plan for communication, approach and quality control <br />and assurance will be a key component towards a successful design project. Special <br />consideration shall be given towards firms that have all communication go through the <br />project manager and their successor should the project manager be unavailable. (10 %) <br />5. Sample Project Plans — Sample project plans submitted shall be judged based upon <br />clarity, neatness and quality. (10 %) <br />The written response to this Request for Proposal should contain documentation of consultant's <br />and /or consultant's agents' credentials and expertise in this field. Substantial consideration will <br />be given to consultants with demonstrable and documented experience in similar work. <br />Responses will be evaluated on the basis of the qualifications, abilities, and responsiveness of <br />the proposing firms. <br />Interview — The City of Santa Ana will consider results from the interview in the overall <br />evaluation of the proposals. To be considered for an interview, a review of the written proposals <br />shall be done by the review panel. A short list of the top six (6) Proposers will be selected <br />to participate in an interview /presentation based upon the highest total scores of items 1- <br />5 (80% of total score for final 6 firms). The selected Proposers will be given the opportunity <br />to discuss in more detail their qualifications, past experience, proposed work plan and <br />schedules. The interview must include the project team members expected to complete a <br />majority of work on the project, but no more than four (4) members total. The Interview will <br />consist of a brief presentation of the company by the proposing firm, including the person who <br />will be the project manager on this Contract followed by questions and answers. All individuals <br />present at the interview shall provide a brief self - introduction and explanation of applicable <br />project experience. Audiovisual aids may be used during the oral interviews. (20 %) <br />The committee and or the executive director of Public Works Agency (PWA) will open the <br />fee envelope of the highest two (2) ranking proposers after interviews have been <br />conducted and scored. The committee shall enter into negotiations for pricing and terms of <br />11 <br />25C -20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.