My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ON-CALL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
06/03/2014
>
25C - AGMT - ON-CALL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 5:30:08 PM
Creation date
5/29/2014 5:25:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/3/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pipe. All permits will be procured to <br />perform the potholing. All potholes will <br />backfriled using native soil and capped <br />with permanent cold patch. If duct banks <br />are potholed, the top and bottom of the <br />duet batik will be field verified <br />6. Survey and Right -of -Way <br />A, Provide survey control using County GpS <br />points, <br />C, Leighton will complete laboratory testing <br />and perform geoteclmical analysis of the <br />collected data. <br />D. Leighton will prepare a geoteclmical report <br />presenting the findings and <br />recommendations, hicludiug groundwater <br />conditions, ease of excavation, temporary <br />shoring design, and pipe bedding <br />recommendations. <br />B. Provide field survey profile over dee <br />9. Alignment Selection <br />proposed sewer pipeline at 100 -foot <br />intervals. This is a similar approach to <br />A. Tetra Tech will prepare preliminary <br />what we used for tlee Westminster Avenue <br />drawings (30% milestone) as required to <br />establish agreement on scope, alignment, <br />Sewer Improvement Project. <br />parameters, maintenance concerns, <br />C. Field locate and dip existing sewer <br />constructability, traffic Impacts, and <br />manholes, connection points and storm <br />general disruption to the area. We will <br />drain crossings along the proposed <br />submit the preliminary design to the City <br />alignment for all pipelines. <br />of Santa Ana staff for review and approval. <br />D. Tetra Tech will prepare dre base reaps <br />The basis of design technical memorandum <br />will address the following subjects: <br />using the above survey information, street <br />improvement plans (tire latest, most recent <br />1) Evaluation of replacement in same <br />improvement plans), and supplemented <br />alignment verses parallel alignment <br />with Google aerial map. Tetra Tech will <br />2) Water and sewer main alignment, <br />plot utilities on the base maps based on <br />including evaluation of the impact to <br />information obtained from the utility <br />adjacent businesses, residences and <br />information as well as from USA markings <br />traffic <br />In the field, Tetra Tech will perform all <br />2) Manhole locations and connection to <br />necessary research to obtain the necessary <br />existing manholes <br />right -of-way information, <br />3) Maintaining existing service <br />8. Geoteclneical Investigation <br />connections <br />4) Hydraulics based on slopes <br />A. Leighton Consulting, .Inc. will perform tine <br />5) Method of construction, especially at <br />geotechnical investigation, The <br />the major street crossings <br />gootechnical exploration will provide the <br />6) Traffic control concepts <br />design team and Contractor with tine <br />7) Construction schedule and pleasing <br />expected subsurface and groundwater <br />and construction cost estimate <br />conditions at the project site that will assist <br />8) Conflicts with other utilities <br />in design and construction of the proposed <br />9) Potholing recommendations <br />improvements, <br />10) Abandonment of existing water and <br />B. Leighton will perform subsurface <br />sewers (if select parallel alignment) <br />11) Areas where construction is <br />exploration consisting of drilling, logging <br />wodc <br />limited or controlled <br />and sampling of three (3) hollow -stcm <br />12) Permit requirements <br />auger borings to a depth of 15 feet below <br />the existing grade. The borings will be <br />12, CEQA Dacumentatioti <br />spaced along the length of the project. The <br />borings will be backfilled with soil cuttings <br />A. Tetra Tech will prepare documentation <br />and patched with cold -mix asphalt. Traffic <br />required to fidfill the California <br />Environmental Quality Act (CEQA) <br />control will be provided, as necessary. <br />requirements. We have assumed a <br />Negative Declaration will be required for <br />hL ",4L d; cline \Ihnno,rnloRVTRS PY204F W1hJ _SA Oi,Callcnpvu [4- <br />TETRA TEE" <br />25C -45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.