My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ON-CALL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
06/03/2014
>
25C - AGMT - ON-CALL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 5:30:08 PM
Creation date
5/29/2014 5:25:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/3/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the project as stated in the RFP. On similar <br />Past projects we have found drat a Notice <br />of Exception is the only requirement as the <br />project is replacing an existing facility with <br />no appreciable upsize in capacity, The <br />following services will be performed: <br />1) Initial Study and Mitigated Negative — <br />Prepare an Initial Study (IS) that will <br />include completion of an IS checklist <br />to identify impacts and possible <br />mitigation measures. <br />a. Prepare and submit a draft <br />Negative Declination (ND) based <br />on the results of the IS to the City <br />for review. Incorporate City <br />comments in to the ND. <br />b. Submit the final draft ND for <br />distribution and commencement of <br />public review. <br />c. Respond to commments received <br />from public review and submit <br />final ND. <br />d. Prepare a Notice of Determination <br />consistent with CDQA Guidelines <br />15075 and transmit to the City for <br />Tiling. <br />e. Tetra Tech will submit four (4) <br />copies of the draft ND to the City <br />for review, 25 copies of final draft. <br />ND for public review, including <br />15 copies for submittal to the State <br />Clearinghouse, PDF of draft <br />public review response to <br />comments and 15 copies of the <br />Final ND, <br />Trash No. 2 Final Design <br />1, Construction Plans <br />A. Tetra Tech will prepare one bid package of <br />detailed drawings and specifications for <br />competitive biddings for the proposed <br />construction work. We will prepare <br />documents, which will include, but not be <br />limited to the following drawings: <br />1) Title Sheet (including general notes and <br />construction notes, location and vlclllity <br />maps, symbols and abbreviations, <br />construction legend, basis of bearing <br />and bench nnark) <br />2) Water Main Plan Sheets (at 20 scale) (2 <br />sheets) <br />3) Sewer Main Plan and Profile Sheets (at <br />20 scale) including Hydraulic Data (8 <br />sheets) <br />4) Sewer Abandonment Plan, Sequencing <br />Plan and Typical Lateral Connection <br />Details (1 sheet) <br />5) Water Detail Sheet Including <br />Trench/Pavement Replacement Detall, <br />Typical Cotmectiou Detail and Valve <br />Anchor (1 sheet) <br />6) Sewer Detail Sheet including <br />TronclOavemcat Replacement Detail,, <br />Typical Trench Section and Sewer Later <br />Encasement, and Misc. Details (1 sheet) <br />The project schedule for the sample project is <br />shown on tine following page, The schedule <br />assumes 10 day review cycles by the City, <br />Saa Lorenzo Lifi Slation. Rendering <br />�LlMnrk¢dnglPmVOmIx1W11151Py1p Wr WTO.11 5.4 -0n @IIEng¢ _ t� <br />25C -46 <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.