Laserfiche WebLink
John Nagle, P,Eā€ž Project Manager <br />John Nagle, PE, has lent his knowledge and expertise to numerous municipal <br />agencies throughout the region, including the Golden State Water, Mesa Water <br />District, Santa Margarita Water District, and others, As such, he Is familiar with the <br />structure, requirements and challenges of local government factions and well versed <br />In meeting those clients' needs. John Is adept at identifying and scraping projects <br />effectively to launch projects quickly and efficiently. He understands the importance <br />of rapidly determining critical Issues and project constraints. Selected projects <br />include: On -Call Engineering for Castaic Lake Water Agency; Mesa Water District, <br />Golden State Water Company; Whittier Pumping Plant No. 2 Replacement; and <br />Santa Margarita Water District - MiddleChiquita Canyon Water Facilities, <br />Tor! Yokoyama, RE., Task Manager <br />Tor! Yokoyama, PE, serves as both Project Manager / Project Engineer at RBF and <br />has extensive experience in the planning and design of water and wastewater <br />Infrastructure. Selected projects include: City of Anaheim Sewer System <br />Improvements (multiple projects), Long Beach Water Department Atlantic Avenue <br />Cast Iron Main Replacement (in construction), and Yorba Linda Water District <br />Waterline Replacements (In construction). <br />Kevin Gustorf, P.E., q/1 /qC <br />Kevin Gustorf, PE, has served as project manager or performed quality control for <br />water and sewer improvements throughout Orange County. As a Vice President at <br />RBF with 15 years of experience, Kevin understands the Importance of quality <br />control to ensuring planning and design documents are free from error. Kevin has a <br />strong technical background In the planning and design of water storage and <br />delivery facilities, and sewerage systems. Selected projects include: On -call <br />Engineering for El Toro Water District, Orange County Sanitation District, Long Beach <br />Water Department, American Water, Port of Long Beach, and Western Municipal <br />Water District. <br />SUMMARY TABLE OF TEAM QUALIFICATIONS <br />Registration <br />Civil Engineer, CA, 46972 <br />Education: <br />M.S., Civil Engineering <br />8,5., CIVII Engineering <br />Years of Experience: 26 <br />Registration <br />Clvl1 Engineer, CA, 71482 <br />Education; <br />B,S, Civil Engineering <br />Years of Experience; 10 <br />Registration <br />Civil Engineer, CA, 64755 <br />Education: <br />B.S, Civil Engineering <br />Years of Experience: 15 <br />25C -86 <br />Cindy Miller, PE <br />Client 80Nices Officer <br />20 <br />B.S., Civil Engineering <br />Civil Engineer, CA, C0581 IS <br />Orange County Groundwater storage Program <br />WaterPNastewater Facilities <br />GSWC Water Pipeline Projects <br />Whittier Pum ing Plant No 2 Replacement <br />John Nagle, PE <br />Projer,tManager <br />20 <br />8.5., Civil Engineering <br />M, S., Civil Enghearing <br />CNiI Enylnee4 CA, 46972 <br />(also registered in NV,AZ, UT) <br />On -Call Services - Multiple Agencies <br />Whittier <br />Water/Wastewater Facilities <br />State Water Right 8uive or, NV 1101 <br />Pumping Plant No, 2 Replacement <br />OCA4 Pipeline RehabllitalilRe lacement <br />Tor! Yokoyama, PE <br />Task Manager <br />10 <br />B. &ā€ž Civil EngineeringCMiI <br />Engineer, CA, 71482 <br />Long Beach Water Dept, Water Main Replacement <br />WalerlWaslewater Facilities <br />OCSD - Sewer Improvements <br />Kevin Gustorf, PE <br />15 <br />B.S., Civil Engineering <br />Civil Englneef, CA.64755 <br />Anaheim Citywide Server R &R Program <br />Long Beach Water Dept. Water Main Replacement <br />QA/ QC <br />WaloiNvaslewoler Facilities <br />Civil Engineer, NV, 18880 <br />OCSD- Sewer Improvements <br />Stave Canner, PE <br />20 <br />B. S., Civil Engineering <br />Civil Engineer, CA, 599 66 <br />On -Call Services - MuIU le Agencies <br />Cily of Bovow Hills'Neter Main Replacements - <br />Waledwastawater Facillnes <br />IRWD Alton Parkway Water, Reclaimed Water, and <br />John Harris, PE <br />36 <br />M.S., Civil Engineering <br />Civil Engineer, CA, 38217 <br />Sewer Pipeline Design <br />Johnson Avenue Trunk Sewer Replacement <br />Sewer Faoililles <br />B.S., Civil Engineering <br />CNiI Engineer, AZ, 27775 <br />Avalon Sewer Collection System <br />Mlrko Maher,PE <br />15 <br />B. s., Civil and Environman- <br />Civil Englneer,CA,64645 <br />San Diego Rec clad Water Main Extensions, Group . 2 <br />OCSD Santa Ana Trunk Sewer Re hebililsiion <br />WaterANastewaler Faciflios <br />hl Engineering <br />OCSD Newport Force Main Rehabilitation <br />-- <br />W WRA Interceptor Ntodelin <br />25C -86 <br />