John Nagle, P,Eā Project Manager
<br />John Nagle, PE, has lent his knowledge and expertise to numerous municipal
<br />agencies throughout the region, including the Golden State Water, Mesa Water
<br />District, Santa Margarita Water District, and others, As such, he Is familiar with the
<br />structure, requirements and challenges of local government factions and well versed
<br />In meeting those clients' needs. John Is adept at identifying and scraping projects
<br />effectively to launch projects quickly and efficiently. He understands the importance
<br />of rapidly determining critical Issues and project constraints. Selected projects
<br />include: On -Call Engineering for Castaic Lake Water Agency; Mesa Water District,
<br />Golden State Water Company; Whittier Pumping Plant No. 2 Replacement; and
<br />Santa Margarita Water District - MiddleChiquita Canyon Water Facilities,
<br />Tor! Yokoyama, RE., Task Manager
<br />Tor! Yokoyama, PE, serves as both Project Manager / Project Engineer at RBF and
<br />has extensive experience in the planning and design of water and wastewater
<br />Infrastructure. Selected projects include: City of Anaheim Sewer System
<br />Improvements (multiple projects), Long Beach Water Department Atlantic Avenue
<br />Cast Iron Main Replacement (in construction), and Yorba Linda Water District
<br />Waterline Replacements (In construction).
<br />Kevin Gustorf, P.E., q/1 /qC
<br />Kevin Gustorf, PE, has served as project manager or performed quality control for
<br />water and sewer improvements throughout Orange County. As a Vice President at
<br />RBF with 15 years of experience, Kevin understands the Importance of quality
<br />control to ensuring planning and design documents are free from error. Kevin has a
<br />strong technical background In the planning and design of water storage and
<br />delivery facilities, and sewerage systems. Selected projects include: On -call
<br />Engineering for El Toro Water District, Orange County Sanitation District, Long Beach
<br />Water Department, American Water, Port of Long Beach, and Western Municipal
<br />Water District.
<br />SUMMARY TABLE OF TEAM QUALIFICATIONS
<br />Registration
<br />Civil Engineer, CA, 46972
<br />Education:
<br />M.S., Civil Engineering
<br />8,5., CIVII Engineering
<br />Years of Experience: 26
<br />Registration
<br />Clvl1 Engineer, CA, 71482
<br />Education;
<br />B,S, Civil Engineering
<br />Years of Experience; 10
<br />Registration
<br />Civil Engineer, CA, 64755
<br />Education:
<br />B.S, Civil Engineering
<br />Years of Experience: 15
<br />25C -86
<br />Cindy Miller, PE
<br />Client 80Nices Officer
<br />20
<br />B.S., Civil Engineering
<br />Civil Engineer, CA, C0581 IS
<br />Orange County Groundwater storage Program
<br />WaterPNastewater Facilities
<br />GSWC Water Pipeline Projects
<br />Whittier Pum ing Plant No 2 Replacement
<br />John Nagle, PE
<br />Projer,tManager
<br />20
<br />8.5., Civil Engineering
<br />M, S., Civil Enghearing
<br />CNiI Enylnee4 CA, 46972
<br />(also registered in NV,AZ, UT)
<br />On -Call Services - Multiple Agencies
<br />Whittier
<br />Water/Wastewater Facilities
<br />State Water Right 8uive or, NV 1101
<br />Pumping Plant No, 2 Replacement
<br />OCA4 Pipeline RehabllitalilRe lacement
<br />Tor! Yokoyama, PE
<br />Task Manager
<br />10
<br />B. &ā Civil EngineeringCMiI
<br />Engineer, CA, 71482
<br />Long Beach Water Dept, Water Main Replacement
<br />WalerlWaslewater Facilities
<br />OCSD - Sewer Improvements
<br />Kevin Gustorf, PE
<br />15
<br />B.S., Civil Engineering
<br />Civil Englneef, CA.64755
<br />Anaheim Citywide Server R &R Program
<br />Long Beach Water Dept. Water Main Replacement
<br />QA/ QC
<br />WaloiNvaslewoler Facilities
<br />Civil Engineer, NV, 18880
<br />OCSD- Sewer Improvements
<br />Stave Canner, PE
<br />20
<br />B. S., Civil Engineering
<br />Civil Engineer, CA, 599 66
<br />On -Call Services - MuIU le Agencies
<br />Cily of Bovow Hills'Neter Main Replacements -
<br />Waledwastawater Facillnes
<br />IRWD Alton Parkway Water, Reclaimed Water, and
<br />John Harris, PE
<br />36
<br />M.S., Civil Engineering
<br />Civil Engineer, CA, 38217
<br />Sewer Pipeline Design
<br />Johnson Avenue Trunk Sewer Replacement
<br />Sewer Faoililles
<br />B.S., Civil Engineering
<br />CNiI Engineer, AZ, 27775
<br />Avalon Sewer Collection System
<br />Mlrko Maher,PE
<br />15
<br />B. s., Civil and Environman-
<br />Civil Englneer,CA,64645
<br />San Diego Rec clad Water Main Extensions, Group . 2
<br />OCSD Santa Ana Trunk Sewer Re hebililsiion
<br />WaterANastewaler Faciflios
<br />hl Engineering
<br />OCSD Newport Force Main Rehabilitation
<br />--
<br />W WRA Interceptor Ntodelin
<br />25C -86
<br />
|