Sam Valdez, PE
<br />7
<br />B.S., 2007, Civil Engineering
<br />Civil Engineer, CA, 77660
<br />Laguna Beach County Water District - Domeslic Water
<br />Hydraulic Analysis
<br />Castalc Lake Water
<br />It^�a��7r�7
<br />LLIIIi'1
<br />Master Plan
<br />iyim clwa.orx
<br />Port of Lon Beach Sewer Mosier Plan
<br />Bryan Kallenhaugh, PE
<br />13
<br />B.S., Civil Engineering
<br />Civil Engineer, CA, 73619
<br />Orangelhofpe Avenue Transmission Main
<br />Water/Wastewater realities
<br />GSWC Southwest ""to' Pipeline Re lacemenl
<br />Rhonda Tijedna, PE, LEED AP
<br />3o
<br />BS., Electrical Engineering
<br />Electrical Engineer, CA, 15473
<br />Baksr Regional WalorTreatment Plant
<br />Electrical 7 Instrumentation l
<br />(also registered in NV)
<br />Rio Vista Valve k2 Vault Modifications
<br />Controls
<br />LEED Accredited Professional
<br />Electrical !Controls - multi le um sladons
<br />Alan Ashimme
<br />15
<br />B.A., Environmental Analysis
<br />Capistrano BlulfslPines Park Sewer
<br />Environmental
<br />and Desi n
<br />Prado Reservoir No. 2
<br />Richard Beck, CEP, PWS, CPESC
<br />15
<br />B.A., Environmental Studies
<br />Multiple aerlifcalkms - sea resume
<br />County of Orange On -Call Eranonmentaland
<br />Environmental
<br />Re aletor services
<br />Sal Sheikh, PE
<br />39
<br />M.S., Civil Enghearing
<br />Civil Engineer, CA, 32677
<br />MNWO Seismic Assessment of Reservalrs
<br />Stmctural
<br />(structures)
<br />(also registered in OH, AZ, NV, UT
<br />Baker Regional Water Treatment Plant
<br />B.S. Civil Engineering
<br />Middle Chl uita Canyon Water Facilities
<br />BIII Cox, PLS
<br />35
<br />B,S., Business Atlminisira-
<br />Professional Land Surveyor, CA, 6673
<br />Ahon Parkway Constmcllon Surrey
<br />Surveying
<br />tion
<br />Colorado River Aqueduct As-Needed Survey
<br />County of Orange On-call Survey Services
<br />Ali Bastani, Ph.D, PE, GE
<br />20
<br />Ph.O., and M.S„ Civil and
<br />Geotechnical Engineer, CA,245B
<br />WNW - Middle Chlquas Canyon Reservoirs
<br />GMU Geotechnical Engineering
<br />Environmental Engineering
<br />Civil Engineer, CA 53924
<br />WWRA Intercepter Phases l &2
<br />8.8, Civil Engineering I
<br />Cry oft.os An ales P! aline Breaksin Summer2009
<br />SUBCONSULTANT SERVICES
<br />I(m 23241 Arroyo Vista, Rancho Santa Margarita, CA 92688 1 Phone 949.888,6513
<br />J.FOor;'.� GMU Geotechnical Engineering, Inc. (GMU) has more than 40 years of experience evaluating soil
<br />and rock conditions for clients before, during and after construction to verify stability, meet performance goals and
<br />reduce the potential for unexpected problems. GMU's engineering geologists and geotechnlcal engineers are
<br />specialists In evaluating soil, rock and groundwater conditions for proposed and existing projects.
<br />REPRESENTATIVE PROJECTS
<br />°nrK ra
<br />Client Reference:
<br />t
<br />Mr, Jason Ylm, P.E.
<br />Principal Engineer
<br />Castalc Lake Water
<br />It^�a��7r�7
<br />LLIIIi'1
<br />Agency
<br />661/513 -1277
<br />iyim clwa.orx
<br />Key Staff serving this client:
<br />John Nagle
<br />Cindy Miller
<br />Steve Conner
<br />Tor! Yokoyama
<br />Castaic Lake Water Agency - On -Call Services for Water Facilities
<br />WHAT OUR CLIENTS SAY.-
<br />"RSF Consulting is a great compony to work with. Wo are pleased with their past
<br />and current work performance and look forward to continuing to work with them.
<br />John Nagle is a great person to work with and is a proactive project manager...."
<br />Jason Ylm, RE., Principal Engineer
<br />Castaic Lake WoterAgency
<br />Castaic Lake Water Agency (CLWA) Is a public water wholesaler that provides about
<br />half of the water that Santa Clarita households and businesses use, RBF provides on
<br />call engineering services to CLWA for facilities evaluation and design
<br />improvements, Example projects include the following
<br />a Rio Vista Valve 42 Vault Modifications - 72 -Inch Valve Replacement Project
<br />a Pipeline Inspection Program Planning and Development
<br />a Sand Canyon Pump Station Generator Installation - Constructability Review, Construction Management and
<br />Inspection Services
<br />a Castalc Conduit Bypass Transmission Main - Constructability Review
<br />e Castalc Conduit Erosion Protection Analysis
<br />25C -87
<br />
|