Laserfiche WebLink
R Golden State <br />Iv,e >, comp + +r <br />Client Reference: <br />Mr. $unit Filial, P.E. <br />Engineering Design Manager <br />Golden State Water Company <br />714/535- 7711 %230 <br />901—E mw <br />Golden State Water Company - On -Call Services <br />REF has provided as-needed engineering and supporting services <br />to Golden State Water Company (GSWC) for more than 20 years. <br />Projects have included upgrade and replacement of existing <br />facilities through Its service areas. The following are selected <br />recent projects completed by REF's Project Manager, Mr. John <br />Nagle, and his team members. <br />Anaheim and Placentia - Orangethorpe Avenue Transmission <br />Main and Concerto Booster Pump Station Improvements. GSWC required that a <br />transmission main be constructed to inter- connect Its Placentia and Yorba Linda <br />service areas. This was a "fast - track" project for GSWC because It is a primary <br />water supply to the Yorba Linda service area, Concerto Well No, 2 was to be <br />removed from service due to water quality Issues, and the pipeline needed to be <br />operational prior to the well shut down. RBF provided engineering design and <br />survey services for and construction of approximately 6,500 LF of 16 -inch DIP <br />pipeline, In the cities of Placentia and Anaheim. This pipeline provides a connection between GSWC's Placentia and <br />Yorba Linda Service Areas, and Includes three pressure regulating stations, The scope of services included <br />extensive utility research, topographic survey and right -of -way verification, preparation of PS &E's, and traffic <br />control plans. The project also required coordination with the Orange County Flood Control District for crossing of <br />the Atwood Channel, and coordination with Orange County Transportation Agency for a future grade separation <br />project at Lakeview Avenue. <br />Norwalk System. This work Included design of water distribution pipeline replacement projects in the Norwalk <br />System. These pipeline projects were necessary to address leaks, hydraulic deficiencies, inaccessibility, and <br />condition of the existing pipelines. The project included the installation of 1,300 LF of 12 -Inch DIP and 10,000 LF of <br />8 -Inch DIP, as well as the relocation of over 275 domestic water services. The project was divided into two phases, <br />and the Phase 1 design schedule was accelerated to meet the construction deadline of a street re- paving project <br />on Pioneer Boulevard. <br />southwest District Pipeline Replacement Projects - Gardena, Hawthorne and Inglewood. As part of the <br />Implementation of their capital Improvement program, GSWC contracted with RBF- to provide professional <br />engineering services for their Southwest District Pipeline Replacement Project that included pipeline replacements <br />In four separate areas: Project 25003040 - 3,100 LF of 12 -Inch and 8 -Inch DIP In 137th Street, Mariposa Avenue, <br />and Raymond Avenue in the city of Gardena; Project 25003043 - 2,000 LF of 8 -inch DIP in 144th Street in the city <br />of Gardena; Project 25003044 - 3,100 LF of 12 -Inch and 8 -inch DIP In Imperial Highway and Prairie Avenue in the <br />cities of Inglewood and Hawthorne; and Project 25003046 - 1,300 LF of 8 -inch DIP in Compton Boulevard in Los <br />Angeles County. <br />M10 9P VAlep eta <br />a <br />Client Reference: <br />Dennis P. Cafferty, P.E. <br />Director of Operations & <br />Engineering <br />El Toro Water District <br />949- 837 -7050 X223 <br />dcnfrert @etw .cps <br />Key Staff serving this client: <br />Kevin Gustorf <br />Tor! yokoyama <br />Ei Toro Water District - On -Call Services <br />'The El 'Toro Water District (District) has been utilizing the professional consulting <br />services of RBF on an on -call and as- needed basis for over ten years. The District has <br />maintained a long-standing professional relationship vvlth R3F for decades. The <br />District has always found the RSF team to be responsive, technically competent <br />provide a high - quality product and a pleasure to won< with... HE continually <br />provides the District with extremely high - quality service, while meeting the project <br />schedules and staying within the allocated budget. The District Will undoubtedly <br />continue to call upon RBF to serve the District in various capacities, and I can confF <br />dently recommend RBF as a reliable engineering consultant firm." <br />Dennis Cafferty, P.E., Director of Engineering and Operations, El Toro Water District <br />25C -88 <br />