My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - ON-CALL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
06/03/2014
>
25C - AGMT - ON-CALL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 5:30:08 PM
Creation date
5/29/2014 5:25:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
6/3/2014
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Approach <br />UNDERSTANDING <br />Tha City of Santa Ana Is committed to serving Its population of 325,000 people with reliable and high- quality water and <br />sewer service. As part of this commitment, the City desires to select two consultants to provide engineering services on <br />an as- needed basis. The services in general wlll consist of water and sewer main replacement design projects on arterial <br />highways, local roads and public right of way citywide. The projects also may Include general street improvements. <br />Environmental studies and documentation In accordance with CEQA will be required on all projects. Other services may <br />also include construction management and inspection, mechanical, electrical, structural, and /or surveying. Other design <br />projects may Include pump stations, wells, reservoirs, utility vaults and sewer lift stations, <br />APPROACH TO ON-CALL SERVICES <br />The on -call consultant must have a proven approach in designing water and sewer main <br />projects in busy arterials and commercial areas. Addressing the concerns of the surrounding <br />community and businesses and minimizing each project's Impact to them are Just as <br />Important as properly designing a pipeline. The RBF team Is eager to establish an excellent <br />working relationship with the City through exemplary service, design expertise, and a smooth <br />design process. We have had great success providing on -call services with several local clients, <br />as well as providing water and sewer main designs for a multitude of clients. Our team's design approach Is <br />founded an the principles of choosing a highly qualified team, encouraging Innovative thinking, embracing the <br />concept of value engineering, performing alternative analyses, and Implementing day-to -day proactive project <br />development. This allows us to develop the best solutions for the City. Our philosophy combined with open <br />communication with the City during all project phases will ensure a successful project. RBF's project approach will <br />ensure the upfront preliminary engineering is completed properly to successfully move forward with final design <br />and construction within the project schedule and budget. RBF's approach to delivering a quality project to the City <br />Incorporates the following key elements: <br />• Understanding the City's concerns, goals, and expectations. <br />• Placing expert personnel In positions to address those concerns and meet the City's goals and <br />expectations. <br />• Proactively communicating analysis results and potential conflicts In order to make Informed decisions In <br />a timely manner, <br />• Identifying and addressing key project Issues. <br />• Implementing a thorough QA /Oc program. <br />RBF will carefully manage each phase of work in accordance with the required elements and major milestones, <br />During the kickoff meeting, these items will be reviewed with the City to ensure the project goals and special <br />concerns are Identified upfront. Careful consideration In the upfront planning and design will be achieved by <br />creating a work plan encompassing all project elements. The successful implementation of the work plan requires <br />early Identification of key Issues that need to he evaluated during field investigation and preliminary design. This <br />upfront planning wlll allow RBF to ensure the project stays on schedule and that the City's goals are met, <br />The success of each project will be the responsibility of RBF's Project Manager — Mr. John Nagle, the City's main <br />point of contact. John's knowledge and experience with providing on -call services to clients, and specifically <br />pipeline design will ensure appropriate resources are allocated for each task order and provide for a focused <br />Implementation of each work plan. in addition to his own experience, John will utilize the experience of RBF's in- <br />house design staff experts In the various fields required for the on -call services Including but not limited to: <br />environmental, survey, structural, electrical, mechanical, transpa•tatlon, traffic, and permitting. The approach <br />allows each member to operate efficiently within their expertise, so each project can be completed correctly, on <br />schedule and within budget, <br />R. 1. <br />25C -93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.