Laserfiche WebLink
RBF also approaches each project with the philosophy that our project team includes the City's staff, The City's <br />Involvement will be integral throughout all phases of the contract and each Individual project. R3F will <br />communicate regularly with the City's Project Manager to provide updates on project progress, and discuss key <br />Issues that have been decided, or are in need of resolution, Efforts will be made to ensure the City's goals are <br />being met throughout each project. <br />SAMPLE PROJECT <br />Please note, the subsequent sections pertain to the sample project as Identified on page 17 of the RFP. The <br />sections include the Project Understanding, Key Issues, and Scope of Work. The project fee for the sample project <br />has been Included in a separately sealed envelope. Although this was Identified as a sample project, we have taken <br />the same approach as If we were proposing to do this work. We thoroughly reviewed the project and conducted a <br />site walk to gain an understanding of the project area and key Issues. The Scope of Work Identifies the required <br />work items to complete the project based on what is listed In the RFP, and based on our understanding of what the <br />project will require to completion. Our Scope of Work clarifies and expands on the existing language in the RFP for <br />this specific project, and Identifies the required deliverables for each task. <br />Project Understanding <br />The project includes the design of water and sewer main Improvements In the City of <br />Santa Ana. The design shall Include all bid documents Including construction plans, <br />specifications, and cost estimate. The limits of the project are described below: <br />3,200 LF of 8" water main for the following limits: <br />• Rene Drive — Hemlock Way to Segerstrom Avenue <br />• Rita Way— San Lorenzo to Segerstrom Avenue <br />• Spruce — San Lorenzo to Segerstrom Avenue <br />• Pacific Ave— San Lorenzo to Segerstrom Avenue <br />• San Lorenzo — Rene Drive to Pacific Avenue <br />41100 LF of 8" sewer main for the following limits: <br />• Myrtle Street — Bristol Street to Center Street <br />The following Scope of Work describes in detail the tasks associated with this project, <br />Key Issues <br />Key Issue B1: Field Conditions. Based on our project site visits, there are unique field <br />conditions to be aware of that must be considered in design and for any field work <br />taking place (potholing and geotechnical borings). Along Myrtle street there Is a fire <br />station, low hanging overhead lines, County of Orange Flood Control facilities, a park, <br />and street parking on both sides of the street. For the field work to be conducted, we <br />will coordinate with the City to minimize community impacts. Coordination items for <br />the field work will include temporary parking restrictions along the street, and <br />maintaining access requirements for the fire station. <br />Myrtle Street looking east from <br />end ofcubde -sac <br />Fire Station on Myrtle Street <br />lit rl n• „ There Is also a County Flood Control facility at the western end of Myrtle Street, There <br />� E _l�l -'ll'" Is an open channel that transitions into a box culvert as it passes under the park and <br />under the end of the cul -de -sac, As -bUIRS for the facility will be obtained directly from <br />the County (note — County Flood control Is not In the Dig Alert database), and a <br />_,.____.� _ _ r proper design will be provided based on clearance requirements. A "remove and <br />OC Flood Control Channel replace" approach may, be the only feasible option in the vicinity of the culvert. <br />crossing under Myrtle Street <br />10 <br />25C -94 <br />