Key Issue #2: Agency Coordination. Two agencies we will need to coordinate with are County Flood Control and <br />Orange County Sanitation District (OCSD), We have an excellent working relationship with the permitting staff at <br />the County. We will able to Immediately obtain as- bullts for the channel/bcx culvert - in fact, County staff has such <br />familiarity with us that they allow us to take their mylar as- bullts off site to make copies at any time we need, We <br />are also aware of the County's design requirements for clearances from their facilities. <br />We also have a lot of experience with OCSO. We currently have an on -call contract <br />with them. We have extensive experience In connecting to their facilities and <br />designing facilities in their collection system. We understand the process of obtaining <br />a connection permlk and are famlliarwith their standards. <br />Key Issue #4: Construction Into Segerstrom Avenue, Segerstrom Avenue Is a busy <br />street and each of the four north /south streets of the water main project will require OCSDmanholeatMyrtlestreet <br />replacing the pipeline within the street. This will also require construction through the and Bristol Street <br />easements at the end of the cul -de -sacs for Rene Drive, Rita Way, and Pacific Avenue. There are two basic options <br />for construction. One option is to construct the pipeline via open cut trench, which requires having to replace any <br />trees, hardscape, and walls that are existing. The other option will be to use a trenchless form of construction from <br />the end of the cul -de -sac to the connection point in Segerstrom Avenue. This would eliminate extensive damage <br />and replacement to the existing facilities, and also reduce the Impact in Segerstrom Avenue. <br />The appropriate trenchless method would be a "bore and Jack" or pipe ramming <br />method. Pipe ramming would be appropriate because the drive would be short and �+ <br />straight, and the end of the cul -de -sac would be the optimum place for the drive shaft ^:'r n <br />which has a much larger footprint than the recelving shaft that would be required in _ <br />Segerstrom Avenue. We have designed several pipe ramming installations for small — r <br />diameter pipelines. The final construction method and design would be confirmed <br />with the City, Block Wall and ha(dscape at end <br />Scope of Work or Rita Way <br />Task No. 1 <br />1, Initial Meeting <br />a. Attend kick-off meeting with City staff to review project scope, schedule, budget, work plan, design <br />criteria, and parameters. <br />b, Deliverables: <br />I. Meeting Agenda <br />ii, Meeting IInutes <br />2. Data Gathering <br />a. Obtain all available records from the City and scan to pdf pertinent documents for the project. <br />b. Perform site walk and take photographs of existing project area. <br />c. Deliverablesr <br />I. PDF scans of City documents <br />ii. Photos <br />3, Utility Research <br />a. Perform utility research through Dig Alert website. Contact all companies listed within the project <br />limits and request utility Information. There shall bee minimum of 3 requests made to each company <br />In an attempt to obtain their Information. <br />It. Perform utility research with agencies known to not be In Dig Alert website If applicable (le. County <br />storm drains). <br />25C -95 <br />