Laserfiche WebLink
City to go over the strip maps and get agreement from the City on the proposed alignments. <br />d. Prepare a preliminary design technical memorandum for both the water and sewer lines, <br />Identifying the design crlterla for the pipelines, alignments, and key issues. City to review and <br />provide comments, RBF to address comments and submit final version, Acceptance of the final <br />PDR will Initiate the final design process. <br />e, Deliverables: <br />I. Strip Maps of proposed alignments (hard copy -1) <br />Ii. Draft Preliminary Design Technical Memorandum (pdf and hard copies -4) <br />Ill. Final Preliminary Design Technical Memorandum (pdf and hard copies —4) <br />10. Prepare Preliminary Plans (50% PS&E) <br />a. The SD% PS &E submittal shall Include plans, specifications, and cost estimate at 50% completion <br />level (horizontal alignment and design, no profile, no details), Traffic control will be Implemented <br />by the contractor per WATCH. If traffic control plans are required, they will be a requirement of <br />the contractor during construction. Plans will be prepared In Microstatlon v8i per City standards, <br />The anticipated plan sheets forthe 50% submittal Includes a total of 14 sheets as listed below: <br />G1.4 Title Sheet and General Sheets (4 sheets) <br />PP1 -5 Water Plan and Profile Sheets (5 sheets) <br />PP6.10 Sewer Plan and Profile Sheets (5 sheets) <br />b, The specification submittal will Include the front end specifications, technical specification table <br />of contents, and some technical specification sections. <br />c. Deliverables; None (Included In next task) <br />11. 50% PS &E Submittal <br />a. Submit 50% PS &E to the City <br />b. Perform job walk to Identify conflicts and Inconsistencies. Meet with the City to review <br />comments, <br />c. Deliverables; <br />I. 50% P5 &E (pdf and hard copies —4) <br />12. CEQA Documentation <br />No <br />a. Based on a review of the proposed pipeline Improvements and existing setting, It is anticipated <br />that a CEQA Statutory Exemption Will apply to the project. While It is acknowledged that the <br />City's RFP Identifies a Negative Declaration, the use of a Statutory Exemption appears highly <br />appropriate for the project and would result In substantial time and cost benefits to the City. <br />As such, RBF will prepare two (2) separate Notices of Exemption (one for each pipeline <br />project). Each Notice of Exemption (NOE) will cite the CEQA Statutes, Section 21080.21, <br />Application of Division to Public Right -of -Way Pipeline Projects Less Than One Mile in <br />Length. This Statutory Exemption applies to the construction, maintenance, repair, restoration, <br />reconditioning, relocation, replacement, removal, or demolition of pipeline located entirely <br />within public right -of -way, and less than one mile in length. <br />Each NOE will provide a brief project description, a description of the project site and affected <br />area, and substantiation for the exemption. The NOE will be filed with the County Clerk and <br />State Clearinghouse upon approval by the City. <br />This task specifically excludes the preparation of an Initial Study, Negative Declaration, or <br />Environmental Impact Report. If it Is determined by the City that an alternate form of CEC1A <br />documentation is required, a separate scope and'fee can be provided. <br />25C -98 <br />