Laserfiche WebLink
Standard Hourly Rate Schedule <br />Coteaory <br />Rate <br />Principal <br />$ 265 <br />Senior Project Manager <br />215 <br />Senior Engineer/ Planner <br />185 <br />Construction Manager <br />177 <br />Pavement Management Project Manager <br />175 <br />Management Analyst <br />165 <br />Project Engineer / Planner <br />160 <br />Engineer / Senior Technician / Planner /Senior Inspector <br />135 <br />Assistant Engineer / Technician /GIS Planner / Inspector <br />130 <br />C400 Operator <br />110 <br />Administrative Assistant <br />100 <br />Field Technician <br />84 <br />Clerical/ Word Processing <br />75 <br />Forensic Services <br />Quote <br />Reimbursables <br />Mileage <br />$ 0.65 1mile <br />Subconsultant Services <br />Cost + 15% <br />Reproduction <br />Cost + 15% <br />Travel & Subsistence <br />Cost + 15% <br />Fees & Permits <br />Cost + 15% <br />Computer Services (External) <br />Cost + 15%' <br />Standard Hourly Rates <br />shown will not be <br />changed and /or <br />increased during the <br />contract period <br />BUCKNAM INFRASTRUCTURE GROUa, INC. <br />r..a 1 3 _ 1...Ei <br />7 -1 <br />