My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDMODELING INC. -2014
Clerk
>
Contracts / Agreements
>
I
>
IDMODELING INC. -2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2014 1:44:25 PM
Creation date
6/4/2014 1:35:18 PM
Metadata
Fields
Template:
Contracts
Company Name
IDMODELING INC.
Contract #
A-2014-052
Agency
PUBLIC WORKS
Council Approval Date
2/18/2014
Expiration Date
12/31/2014
Insurance Exp Date
1/6/2015
Destruction Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Mission Statement <br />Utilize the Hydraulic Model to add value to the <br />City of Santa Ana's (City) water business by <br />offering insight and foresight into operational <br />and planning decisions. <br />Key Objectives <br />The key objectives of this Water System Computer <br />Modeling Project (Project) Include: <br />1. Building an accurate, operational hydraulic <br />model which the City can use to confidently plan <br />and operate its water system. <br />2. Calibrating the model to consistently achieve <br />regulatory compliance; assure pipeline capacity <br />for consistent, acceptable customer service, and <br />optimize operations to reduce wear on facilities <br />and operational spending. <br />3, Analyzing (Value Add) the water system model <br />by applying planning and operational criteria. <br />Results of these analyses will be directly <br />applicable to the City's Water Master Plan, and <br />provide insight into fire flow deficiencies, <br />locations of vulnerability, potential flushing areas, <br />and system bottlenecks to reduce energy spend. <br />Build — Calibrate - Analyze — will be consistent <br />themes throughout this proposal. Our phased project <br />approach will continue to support this focus. <br />a. Approach <br />b IDM proposes an approach to support and reinforce <br />this Project's Mission Statement and Key Objectives <br />This section of our proposal will discuss the primary <br />drivers to support the Scope of Work In the City's RFP. <br />2. Implementation Plan <br />1. Data Collection using a proven Data Request List <br />(DRL) and a review of system hydraulics to ensure <br />model convergence, and support calibration. <br />2. PIan1 establishes assumptions and methodology <br />for foundational elements of this Project. <br />3. Build a Robust Hydraulic Model, considering the <br />hydraulic sensitivity of the City's water system. <br />4. Plant & Calibrate establishes the process, <br />resources, and goals for model calibration & <br />calibrates to acceptable tolerances for Planning <br />and Operational applications. <br />S. Analyze the calibrated hydraulic model to ensure <br />water system capacity and efficiency. <br />6. Deliver a sustainable solution for the City's <br />ongoing hydraulic modeling, training included. <br />Using this approach and our proposed Project <br />Workplan (Figure 1, below), IDM will "create accurate <br />and robust analysis tools for detailed operational and <br />planning analysis. <br />FIGURE 1— PROJECT IMPLEMENTATION PLAN <br />i <br />i <br />e <br />° IDM0DEL1NG@ <br />We can be more, together. <br />
The URL can be used to link to this page
Your browser does not support the video tag.