My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-028 - Approving General Plan Amendement No. 2014-01
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2014
>
2014-028 - Approving General Plan Amendement No. 2014-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 9:24:38 AM
Creation date
6/11/2014 12:36:01 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2014-028
Date
6/3/2014
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utilities and Service <br />Impact Analysis <br />City of Santa Ana - Park View at Town and Country Manor <br />Draft EIR <br />The project would not require or result in the construction of new water or <br />wastewater treatment facilities or expansion of existing facilities, the construction <br />of which could cause significant environmental effects. <br />[CEQA Utilities and Service Systems Threshold 16(a)] <br />[CEQA Utilities and Service Systems Threshold 16(b)] <br />[CEQA Utilities and Service Systems Threshold 16(e)] <br />The proposed project is projected to generate 0.03 million gallons per day (mgd) of wastewater (see <br />Table 4.7 -2; 30,077 gallons per day or 0.03 mgd). This wastewater would be conveyed to OCSD <br />Reclamation Plant No. 1 in Fountain Valley, and Plant No. 2 in Huntington Beach. Plant No. 1 has a <br />capacity of 180 mgd. If Plant No. 1 is operating at capacity, sewage is diverted to Reclamation Plant <br />No. 2. Therefore, the proposed project would not result in a need to construct a new waste treatment <br />plant or local facilities. OCSD operates the treatment plants in accordance with the Regional Water <br />Quality Control Board (RWQCB) wastewater treatment requirements. <br />Table 4.7 -2: Estimated Wastewater Generation <br />Wastewater originating from the project site would discharge to a local sewer line and then be <br />conveyed to OCSD's 30 -inch trunk line in Main Street. There is currently a 12 -inch City sewer main <br />located at the intersection of Lawson Way and Memory Lane that is connected to the project site via a <br />10 -inch sewer lateral, located on the northeast corner of Lawson Way and Memory Lane. The 30- <br />inch trunk line was built to accommodate flows originating from existing and planned development in <br />the immediate area, having a design capacity of approximately 15 million gallons per day (mgd). <br />4.7-4 Michael Brandman Associates <br />H\Cl t (PN JN)b327b327W3(MME 3270030 SeN 7Utilitiese d Service Sy9ems.d <br />Estimated Project <br />Wastewater <br />Land Use <br />Development <br />Generation Ra <br />Generation (gpd) <br />Residential <br />174 du <br />110 gallons /day /person <br />28,7102 <br />Park View Kitchen and <br />2,300 sf (approx.) <br />50 gallons/day/200 sf <br />575 <br />Dining Area <br />Aquatic and Wellness Center <br />7,920 sf (approx.) <br />100 gal/day /1,000 sf' <br />792 <br />TOTAL <br />30,077 <br />Notes- <br />' Obtained from the City Place Final EIR, City of Santa Ana, 2005. <br />2 Assumes 1.5 persons per unit based on some units being occupied by a single individual. <br />3 Represents one -half the generation rate used for restaurants in the City Place Final EIR, City of Santa Ana, 2005. <br />Only one meal, continental breakfast, will be served in the Park View dining area. Park View residents will have the <br />option of buying dinners in the main dining room of the Town and Country Manor campus, but it is anticipated by the <br />Applicant that this occurrence will be very intermittent. Applying a 50 percent restaurant generation rate for <br />wastewater to the proposed project is likely an over - estimation and therefore represents a generous, worst -case <br />estimate. <br />° Obtained from the Ponte Vista Draft FIR for pool and recreation area to serve a large condominium complex, <br />accessed from Website http:// citypianning .lacity.org/eir/PonteVista/DEIR/ <br />Draft% 20EIR %20Sectims /IV.K.2 %20Wwtewater. Accessed September2009. <br />du = dwelling unit sf = square feet gpd = gallons per day <br />Wastewater originating from the project site would discharge to a local sewer line and then be <br />conveyed to OCSD's 30 -inch trunk line in Main Street. There is currently a 12 -inch City sewer main <br />located at the intersection of Lawson Way and Memory Lane that is connected to the project site via a <br />10 -inch sewer lateral, located on the northeast corner of Lawson Way and Memory Lane. The 30- <br />inch trunk line was built to accommodate flows originating from existing and planned development in <br />the immediate area, having a design capacity of approximately 15 million gallons per day (mgd). <br />4.7-4 Michael Brandman Associates <br />H\Cl t (PN JN)b327b327W3(MME 3270030 SeN 7Utilitiese d Service Sy9ems.d <br />
The URL can be used to link to this page
Your browser does not support the video tag.